Here iam a question with SYNCHRONIZATION PANNEL related
issue,
as i want to design a SYNC.pannel board iam giving the 2
nos of 1MVA Generators to sync pannel , then what wil be
the out put of the sync pannel, whether it wil be one cable
coems from the sync panel or two cables..
as iam using two transformers to meet my load demand,
so pls clear me whether two cables comes from sync panel to
connect to transformers or only one cable
Answers were Sorted based on User's Feedback
Answer / k.prakashchandra
One cable from synch panel and use a selector switch for each tr
| Is This Answer Correct ? | 2 Yes | 0 No |
Answer / mahesh.kp679
hai Mr K.prakashchandra
thanks for your ans..
well.. i would like to know detailed..
pls can you help me out...
CAN YOU GIMME A TEST MAIL ON my mail id..
mahesh.kp679@gmail.com
Mahesh KP
| Is This Answer Correct ? | 0 Yes | 0 No |
Can u start a tube light without a starter?
what is the difference between phase and neutral?
3 Answers IAF, Indian Airlines,
Am i eligible to get electrical supervisor licence? As i did diploma as well as degree in Electrical Engg. in June 2011. Now i am working in 15 MW Power plant from 2 mnths. i belongs to Maharashtra.
any calculation method for decide cable size for current?
why voltage form factor of PT are increase , when it is ecpected heigher spikes in system. how it is calculated.
54 Comments Alok and Bhanu play the following min-max game. Given the expression N = 38 + X*(Y – Z) where X, Y and Z are variables representing single digits (0 to 9), Alok would like to maximize N while Bhanu would like to minimize it. Towards this end, Alok chooses a single digit number and Bhanu substitutes this for a variable of her choice (X, Y or Z). Alok then chooses the next value and Bhanu, the variable to substitute the value. Finally Alok proposes the value for the remaining variable. Assuming both play to their optimal strategies, the value of N at the end of the game would be?
Why the starting current in Induction Motor is very high as compared to normal rated current ????
if we know Fault level say 25 KA , How to decide busbar size for Distribution network of 1000 Amp Breaker ? Sample Calculation or Farmula Available or not ?
what is specific gravity of a battery if specific gravity increase/decrease,what will happen to the voltage/current of the battery
Why is the air gap between the pole pieces and the armature kept very small?
Transfer of electric power from primary to secondary in a transformer takes place A electrically B magnetically C electro-magnetically D conductively
What makes the difference between 50Hz supply and 60Hz supply which one is economical and how can you support your answer...........?
2 Answers Fertichem, Kuwait Oil Company,
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)