what is the real de-shuttering time for rcc column,slaband
wall
Answer Posted / ravi kant sharma
Minimum 16 to 18hr for column for any grade of r.c.c.
| Is This Answer Correct ? | 8 Yes | 0 No |
Post New Answer View All Answers
IN Compression testing machine 1division =10KN ,then what is compressive strength of 100*100 mm cubes at a load of 320 KN
How much time Required for PPR pipe network testing
What difference comes in constructing of house and a housing complex like society
what is the max. and mim. height of vertical post in informatry sign board which is used in highway projects.
In Abutment walls (A1 side) why we are adopting fixed bearing (POT-PTFE)?
how to absorb to site basic corrections? which are the important correction?
how much cement and sand required for 100sqm of wall plastering in different proportions
How to marking the building
1.what type of the rock is most suitable for wet mix macadam in construction of road? 2.what is the highest maximum dry density and optimum moisture content can be acheive by using most suitable crush rock?
What is the difference between Hinged and pinned in Column ends
Calculation of Pier Cap with tapper area?
16 questions out of 55 were from the book GUPTA N GUPTA OBJECTIVE of civil engineering. Total ques were 4 ques from hydraullics, 7 from BMC, 4 FROM SOM, 4 from soil mechanics, 6 from transportation, 5 from engineering drawing.
What is OSHA compliance?
How is the strength of cement measured?
Define What are the uses of alloys in daily life and how are alloys made?