what is the real de-shuttering time for rcc column,slaband
wall
Answer Posted / royalcivil
the de-shuttering time for the slab is 21 days must.
for the column it should be minimum of 1 week
| Is This Answer Correct ? | 10 Yes | 26 No |
Post New Answer View All Answers
What is the maximum strength of cub compress strength in one cub testing
What are the Types Of DPC and its Thickness used?
How will drive weight formula for circular cylinder steel bar in kg/ m please step by step drive?
What are the advantages of cad?
density of crush sand & crush stone or grit powder
how much of the strength comes from post-production curing
in a corner footing of a building, column lies in one corner. in this condition i want to know if the reactive pressure of soil will be uniformly distributed throughout the footing or will be uniformly varying as in the case of eccentrical loading.
difference between fc and fc'?
Minimum and maximum size of the building components
If specific gravity of cement is less than 3.15 what is the cause?
is there any codal provision for soil cousion over the Hume pipe of Dia 1.2 m.
How many axes do cartesian coordinate system has?
How to calculate the quantity of cement mortar 2" for mosaic tile fixing 12"x12"?
how ratio is calculated for any grade of concrete. for e.g. sppose M20 requires(x;y:z) quantity of cememt sand and aggregate.
Explain moment of inertia?