how to control PQI (Project Quality Index)
Answers were Sorted based on User's Feedback
Answer / pradip a. sarkar
As per Deming,s Cycle PDCA
where P = Plan (what are the Plans)
D = Do (What to be done)
C = Check (As per Standard or Project Norm.)
A = Action ( If any deviation, take corrective, preventive Action for that)
| Is This Answer Correct ? | 4 Yes | 1 No |
WHAT IS MEANT BY STABILITY?AND WHY CHECK STABILITY TEST METHOD IN THICKNESS SIDE?
explain five benefits of using standard terminology in the measurement process?
What is Soil & Whats the type of soil are there? What is Ultimate & safe stress?
what energized you to complete your course?
how to start basic designing in structure..procedure to knw basic start to do structural designs in civil field?
Define Finite element method (FEM)
What are the advantages of building a dam on the river nile?
If at site iam supposed to get M30.But by mistake i got M20 mix. How could I differentiate the mix before placing?
What is rate of concrete surface rendering work per sqm
how to mack bbs
What is the thickness of slab for 600 sq each) 2 slab construction. What should be the size of steel rod?
what is the unit for sbc of soil
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)