how to control PQI (Project Quality Index)

Answer Posted / pradip a. sarkar

As per Deming,s Cycle PDCA
where P = Plan (what are the Plans)
D = Do (What to be done)
C = Check (As per Standard or Project Norm.)
A = Action ( If any deviation, take corrective, preventive Action for that)

Is This Answer Correct ?    4 Yes 1 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

what is education Cess.

1738


in the earthquqke the profile of water on dam is parabolic or not

1452


What are the methods of measurement? Describe it shortly

1780


What is the cost of shuttering per Sqm.? How it is calculate by thumb rule...?

1170


what is the painting co efficient of slope roof tiles?

1442






What black man invented the clothes dryer?

680


Explain the water bound macadam roag

2251


from one meter cube of stone masonry structure how much cubic meter of cement mortar we use as our estimation 25-30% is that correct for estimation of quantity of sand and cement(2:1) proportion of mortar

4154


plumbing CPVC fitting FTE Brass full form

2130


What is the density of 1:1.5 (Cement:sand) ratio in plaster? And Conversion in 12.5 mm thickness per square meter? Howmany Kg of Cement square meter in ratio of 1:1.5?

2915


What tor stands for in tor steel?

626


What are the joints wants to made in masonry where door opening, arches like etc..

1279


if in column reinforcement lower dia connect to higher dia then from wher we want to start higher dia steel

912


Advantage of Aluminum form work in terms of activities can be skip and cost too

559


What is the quantity of cement used for stone pitching work of 100sqm 225mm thick and cement mortar of 1:6? And how?

4645