Answer Posted / pradip a. sarkar
As per Deming,s Cycle PDCA
where P = Plan (what are the Plans)
D = Do (What to be done)
C = Check (As per Standard or Project Norm.)
A = Action ( If any deviation, take corrective, preventive Action for that)
Is This Answer Correct ? | 4 Yes | 1 No |
Post New Answer View All Answers
what is education Cess.
in the earthquqke the profile of water on dam is parabolic or not
What are the methods of measurement? Describe it shortly
What is the cost of shuttering per Sqm.? How it is calculate by thumb rule...?
what is the painting co efficient of slope roof tiles?
What black man invented the clothes dryer?
Explain the water bound macadam roag
from one meter cube of stone masonry structure how much cubic meter of cement mortar we use as our estimation 25-30% is that correct for estimation of quantity of sand and cement(2:1) proportion of mortar
plumbing CPVC fitting FTE Brass full form
What is the density of 1:1.5 (Cement:sand) ratio in plaster? And Conversion in 12.5 mm thickness per square meter? Howmany Kg of Cement square meter in ratio of 1:1.5?
What tor stands for in tor steel?
What are the joints wants to made in masonry where door opening, arches like etc..
if in column reinforcement lower dia connect to higher dia then from wher we want to start higher dia steel
Advantage of Aluminum form work in terms of activities can be skip and cost too
What is the quantity of cement used for stone pitching work of 100sqm 225mm thick and cement mortar of 1:6? And how?