Answer Posted / pradip a. sarkar
As per Deming,s Cycle PDCA
where P = Plan (what are the Plans)
D = Do (What to be done)
C = Check (As per Standard or Project Norm.)
A = Action ( If any deviation, take corrective, preventive Action for that)
| Is This Answer Correct ? | 4 Yes | 1 No |
Post New Answer View All Answers
do we consider shrinkage factor for calculating cement consumption for CM mixes for different works?
what is difference between NP2 NP3 NP4 CONCRETE HUME PIPES USED AT SITE
what is raft foundation
which software is better for design and analysis of buildings (stadd pro ) or (Etabs)
sir, please send me the web address of chennai railway to know the online examresults of junior engineer[civil].
how to remove the quantity of metal 1 and metal 2 in concrete
What is the worlds largest concrete dam?
The largest size of paper used in plotter to print the drawing made by Autocad .
1.what is the mix proportion for cement soil compressed earth blocks? 2.how to calculate the mix proportion for cement stablised earth soil blocks?
Bernaullis theorem deals with the law of conservation of mass momentum energy none
i am laying a base of dimensions 6.5feet by 7feet by 1.25 feet depth how many bags of 25kg cement and how many bags of 25kg sand will i need
What are the applications of modulus of elasticity?
how to balance aggregate during mix design of concrete???? how to calculate moisture content like C/A,F/A and how many percentage using ice instead of water for example of we are preparing ice concrete??????
For what purpose bedding is used under storm water drains?
What is command line?