Answer Posted / pradip a. sarkar
As per Deming,s Cycle PDCA
where P = Plan (what are the Plans)
D = Do (What to be done)
C = Check (As per Standard or Project Norm.)
A = Action ( If any deviation, take corrective, preventive Action for that)
| Is This Answer Correct ? | 4 Yes | 1 No |
Post New Answer View All Answers
What is thumb rule in quantity and cost estimation of a residential building in civil engineering??
How to increase a bearing capacity of soil?
wat would be the probable interview questions and GD topics for IOCL exam?
What do you mean by tolerance factor of concrete ?
how to calculate labour strength for work for RCC,brickwork,blockwork,in &out plaster,flooring,dado,door frame & shutter,painting etc for constructing highrise building?
show answer/ calculate-1-2-4 ratio-concrete -cement-sand- metal-water - please brief calculation
pls give me ans to ACT formula cube testing porpuse
What is the likely strength of a 1:2:4 concrete mix?
The mixture of different ingredients of cement is burnt at?
explain five benefits of using standard terminology in the measurement process?
How to calculate the weight of sand am 20mm course aggregate in 1 c.m M25 concrete Which use 400 kg of cement ?
What is kn measurement?
What is the difference between routing maintenance and major maintenance in school facilities?
pls tell estimate for 1 kilometre length random rubble masonry 0.90 metre height 0.600 metre width
how to calculate weight of 1.8 cum of aggregate