Answer / muhammad abbas

When the no of turns in secondary are less than the no of
turns in primary the voltage induced in secondary is less
than the voltage applied at primary,so step down process is
done.

Is This Answer Correct ?    14 Yes 1 No

How voltage step down is done? ..

Answer / venkatesh

primary turns is more than the secondary turns in transformer.

Is This Answer Correct ?    2 Yes 0 No

How voltage step down is done? ..

Answer / ambreesh biradar(abb)

by using by step down transformer.in transformer voltage is
directly propotional to the number of
turns.vs/vp=ns/np=ip/is

Is This Answer Correct ?    1 Yes 4 No

Post New Answer

More Electrical Engineering Interview Questions

what is form factor?

3 Answers  


Where -48 volt DC use & why?????????

10 Answers   Ericsson, INDUS, Indus Towers, Telecom,


If we want the fan to consume less electricity at low speed, what do we have to do?

1 Answers  


How many types of Differential protection are there? and what the special arrangement are made at the time of charging of a transformer on the Differential protection?

1 Answers  


what is the minimum dielectric stregth of transformer oil.

25 Answers   HP,






What is given by the definition in BIL IMP/PF = 950/395 kV. This was found in a name plate of a power transformer.

0 Answers   AES,


what happens if you swap F1 and F2 connection in the exiter of the generator?

1 Answers  


what is the main use of ac and dc drives ? it is only used for speed variation or for power saver also?

1 Answers  


in a refinery one motor is suddenly stoped. what will do how can i findout the problem explain step by step

2 Answers  


Two alternators say 1 & 2 are poised to parallel operation. But at the time of paralleing alternator 2 gets out of the system by tripping Earth fault relay. Please send me reply why this is happening?

2 Answers  


sir, I am from EEE branch.On feb 17 iam going to write an Exam for hindustan petrolium corporation Ltd.So plz send me the written exam pattern/Q's/interview questions.please mail to eee_dharmendra@yahoo.com

0 Answers  


Why voltages are 11kv 33kv why not others?

2 Answers  


Categories
  • Civil Engineering Interview Questions Civil Engineering (5085)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4451)
  • Electrical Engineering Interview Questions Electrical Engineering (16632)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)