i know that, the for calculating material required for concrete volume of concrete is taken 50-54 % more for wet volume. i have querry is that cement and sand volume taken more for making wet volume but in the case of aggregate why it is taken more there is no change in aggregate whether it is dry or wet.???? can you give me answer for this???
No Answer is Posted For this Question
Be the First to Post Answer
What is the best type of wood glue?
Rectangular room is more effective than a square room because ––
what is the sequence of the activities in the typical under ground water tank including civil & MEP works.
how to know the one way or two slab
3 Answers ASC, Harmal Enterprises,
How did the romans get water up hills using aqua ducts?
Which percentage of carpet area use in plot area of office building.
discuss the precautions to be taken during the various steps of manufacturing of concrete
whatis the banafit of water leak detection and repair?
How to Calculate the spacing of bars if we use 12 mm dia. bars instead of 10 mm dia. bars. Whereas the 10 mm dia. bars spacing given 0.250 as pr drawing. ?
how much need cement bags for block work of wall approx 1000 hollow blocks 20x20x40cm
Which is default or standard size of tiles used in dado bathroom
Can anyone give me the thumb rule for calculating the time required for construction based on quantity of concrete, Reinforcement, shuttering, etc
Civil Engineering (5086)
Mechanical Engineering (4453)
Electrical Engineering (16638)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)