i know that, the for calculating material required for concrete volume of concrete is taken 50-54 % more for wet volume. i have querry is that cement and sand volume taken more for making wet volume but in the case of aggregate why it is taken more there is no change in aggregate whether it is dry or wet.???? can you give me answer for this???
No Answer is Posted For this Question
Be the First to Post Answer
what is the nomimanal size' os agg.'for reinforced concrete 2 th ph value of water to be used in conc. Shall generly be
while doing the structural works of a simple ground+1 villa, can the columns be continued immediately after neck columns without tie beam, while the tie beam to be done after columns concreting.
What is the purpose of the gap in the road on this bridge?
What is demising walls?
how to calculate the quantaty of steel in footing please show me detail procedure with the help of drawing
can any one tell me how to estimate the reforcement of circular slab and also for dome.
The compressing strength of concrete samples (cubic)
When brick size is 3x5x9" , what would be the number of Brick requirement for 100 sqft area of 5" width?
Are you good at detailing and explain about the project you have worked on detailing?
Detection of a beam & a girder areββββ
Which IS Codes used for the steel reinforcement work?
pls tell estimate for 1 kilometre length random rubble masonry 0.90 metre height 0.600 metre width
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)