Answer / r satya nagendra babu
stage - 01 fixing of boundries,
STAGE - 02 Layouting,
Stage - 03 Marking the footing for excavation,
Stage - 04 sub structure,( footing =s and columns uo to plinth beam )
Stage - 05 Super stucture ( Plinth beam to Slab ie,,,which is above the plinth beam )
Stage - 06 Finishings,( Brick work Plasting Painting And All other activites)
| Is This Answer Correct ? | 0 Yes | 0 No |
Why we use sin wave only in ac not use any other form of wave?
how the lap length is calculated in reinforcement of 110mm dia steel of Length 15.00 mtrs. & grade of concrete is M20
explain the advantages of total stasion
what,s the clear cover of beam,slab,column,lintel and foundation?
36 Answers Max Myanmar, Spar Geo Infra, Yashwant Construction,
what is the grade of 1:2:1 concrete mix
i want texture painting pwd data
give an example for cantilever structure
What is the weight of std brick and 6" ,8",4" solid block...?
What is the quantit;(pratical method) of cement, sand, and gravel to be used in M25 grade of concrete for 1000 x 1000 x 1000 mm of sand (for cement please mention in kilos, and for sand and gravel please mention in cuft
How many Sqm can laid Vitrified tiles for flooring per day per masan?
if L*B*H = 20 then direct no of bricks =20 *500
neutral axis more than the critical neutral axis then rainforcement in rcc beam belong to over or under rainforcement
Civil Engineering (5086)
Mechanical Engineering (4453)
Electrical Engineering (16638)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)