Answer Posted / r satya nagendra babu
stage - 01 fixing of boundries,
STAGE - 02 Layouting,
Stage - 03 Marking the footing for excavation,
Stage - 04 sub structure,( footing =s and columns uo to plinth beam )
Stage - 05 Super stucture ( Plinth beam to Slab ie,,,which is above the plinth beam )
Stage - 06 Finishings,( Brick work Plasting Painting And All other activites)
| Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
Define What is a projection line?
how to tie 10 legged stirrups
What is the crank length in the slab?
how many monpower required for 1 sqm normal RCC structure ( includes finishes & MEP )
what is Bearing Capacity,How to determine it?
Define What are the reasons for geotechnical site investigations in Uganda?
What is the use of mirror command?
Rate analysis of Vitrified tile in cement mortor 1:3
I want to know the relevant IS codes of practice which deals with different testings of cement-sand mortar (nominal mix)that is being normally used for brick work or plaster work in the construction work.
what is idealized curve for concrere and steel
1.Fe500 and Fe550 having more yield strength than Fe415.But why are we prefering Fe415.? 2. d^2/162 formula for knowing the steel wt/m apply all these three? Thanks.
what is grade intersection?
Explain how you can turn off the display for dimension in CAD?
how to find ssm in foundation?
What is the purpose of the gap in the road on this bridge?