can any tell me how to do wiring connection in L&T 3ph 4wire
E301 CT operated energy meter, what is P1,P2,P3,P0.
M1,M2,M3, L1,L2,L3.
Answers were Sorted based on User's Feedback
Answer / k.prakashchandra
Generally , P means potential ,M - Mains (incomer) L -load (
line).Po- Neutral.M and L are for CT terminals incoming and
outgoing respectively, when CTs are used
| Is This Answer Correct ? | 5 Yes | 1 No |
Answer / k.prakashchandra
In other words P1-P0,P2-P0 and P3-P0 are for potential
coils.M1-L1,M2-L2 and M3-L3 are for current coils.
| Is This Answer Correct ? | 5 Yes | 1 No |
what happens if number of poles in stator and rotor windins of slip ring induction motor are not same. Will it rotate near to the synchronus speed defined by stator?
why transformer rating in kva
what you have to see after one week or month from the day of installation of transformer ?
HOW DO A DISTANCE RELAY SENSES THE FAULTY ZONE.
How to the calculating the Reactive power ( kvar )
what is tan delta point in a current transformer?
DC Motors applications used in Lift/Elevators
8 Answers IOCL, SCS, Usha Martin,
How impulse levels are calculated that for 11kV impulse is 75kvp, for 24kV impulse is 125kvp ?
onan full form
which is better ac or dc?
detailed procedure how we calculate cost for pcc m10 and rcc m20 including centering and labour excluding steel/ iron
Why the wave trap is put in Y phse only in switchyard?why not in other phases?
1 Answers IAG Automation, REL,
Civil Engineering (5086)
Mechanical Engineering (4453)
Electrical Engineering (16638)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)