how much quantity of work we can get by rod benders per day
Answer Posted / amit singh
0.5MT
| Is This Answer Correct ? | 10 Yes | 6 No |
Post New Answer View All Answers
Define What is the force exerted by the Tacoma narrows bridge?
what is the service corridor?
I am doing a engineering contract with GOI. I have purchased certain material from outside Maharashtra and paid CST on that material @ 5.25%. Please intimate whether I will be liable for VAT or VAT on works contract or not.
how to calculate 1:5:8 ratio concrete cement, sand, metal and water please give me brief calculation
why building got air crack? if it get in one particular are what is means?
what is the use of steel rods of 16mm or 20mm used for 4.45mts for closing gutter.one mate consumes how many kgs with a gap of 6inches.
sir I got selected in rail vikas nigam limited and they call for interview but i don't what they will ask in interview please guide me if you have any experience
WAP to print 1) 1 1 1 1 1 1 1 1 1 1 2) 1 2 3 4 5 6 7 8 9 10
How much river sand contain the 6 & 10 wheeler truck? Or Maximum sand that any type of truck carry?
how to calculate rate analysys of 1:6 plastering 10 sq m
Describe the advantages and disadvantages of using plastic and timber fenders?
How to calculate the cement consumption in RR Masonry in CM 1:8 for the foundation of Ground Level Reservoir
what is the weight of 10mm,20mm,40mm aggregate
in the construction of residential building what type of tank are used?where?why & what is its purpose?
what happening if we casting HV shunt reactor foundation pad at 50cm height different time (One day difference)