Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...


what are check points to be checked while charging
switchyard?(CT,PT,BREAKER,POWER TRANSFORMER)



what are check points to be checked while charging switchyard?(CT,PT,BREAKER,POWER TRANSFORMER)..

Answer / arun 9865576777

Transformer Commissioning Work


Preliminary Test

1. HT Switchgear End

&#61656; HT BKR IR Value

Open Condition Closed
Condition
R-RI= R-Y=
R-E=
Y-YI= Y-B=
Y-E=
B-BI= B-R=
B-E=


2. Transformer end

&#61656; TRF IR Value
Note: - Neutral earth should be open
LV line PT fuse& earth link open
15sec 60sec 600sec PI
HV-E
LV-E
HV-LV
After the above tests put back neutral earth line pt fuse&
earth link Connection properly.



3. LV Panel End

&#61656; LT BKR IR Value

Open Condition
Closed Condition
R-RI= R-Y=
R-E=
Y-YI= Y-B=
Y-E=
B-BI= B-R=
B-E=


Preliminary Checks

1. HT Switchgear End

&#61656; Check Relay Setting
&#61656; Check Tightness Of CT TB
&#61656; HT Cable Connection
&#61656; Interlock Trial
&#61656; Stability Check
&#61656; BKR Trial In Test Mode
&#61656; Check Fuse
&#61656; Check MTR Operation
&#61656; Reset The All Relay
&#61656; Check Control Supply
&#61656; Reset Max Value On Relay

2. Transformer End

&#61656; TRF Body Earth
&#61656; TRF Neutral Earth
&#61656; HT Cable Connection
&#61656; Check Tightness Of CT TB
&#61656; Check WTI,OTI (or) Door Inter Lock Trial
&#61656; Check OTI,WTI Setting
&#61656; LV Side Flexible Tightness
&#61656; Check Marshalling Box Control Supply



3. LV Panel End

&#61656; Check Relay Setting
&#61656; Check Tightness Of CT TB
&#61656; LV Side Flexible Tightness
&#61656; Check Line PT Fuse
&#61656; BKR Trial In Test Mode
&#61656; Check Control Fuse
&#61656; Check MTR Operation
&#61656; Check U/V Trip Throw Line PT
&#61656; Reset The All Relay
&#61656; Check Control Supply

Before Charging
&#61656; Line PT should be in service
&#61656; LV BKR should be open condition
After TRF Charging
&#61656; Note Down Electrical Parameter In HT Side & LT Side
&#61656; Phase Sequence In LT Side

Is This Answer Correct ?    1 Yes 1 No

Post New Answer

More Electrical Engineering Interview Questions

what is the difference between synchronous generator & asynchronous generator

4 Answers   Reliance,


How to discuss the phase shift of transformer considering open delta?

0 Answers  


Can I use 1 phase power supply to run 3 phase motor? If yes, how?

6 Answers   Enercon,


main difference between ac and dc?

0 Answers   Classic Network,


How to checking sld drawingas and control drawings

1 Answers  


what is the benift of HT metering & LT metering

1 Answers  


difference between alternator & GENERATOR

4 Answers  


what are the accessories need to be added while doing estimation for the following: 1.MCCB 2.MCB 3.ACB

0 Answers  


How to calculate Voltage regulation of 22 KV Over head Line.

0 Answers  


what is the difference between star connected and delta connected motors

3 Answers   Welspun,


CAN WE CALCULATE THE NEGATIVE SEQUENCE AND ZERO SEQUENCE REACTANCE OF A GENERATOR USING ONLY ITS RATED VOLTAGE, KW, PF AND SYNCHRONOUS REACTANCE??? IF YES, THEN HOW??

0 Answers  


The gauge indicates the number of amps, but what about voltage? How voltage rating (for wire or fuse) determined?

0 Answers  


Categories
  • Civil Engineering Interview Questions Civil Engineering (5086)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4456)
  • Electrical Engineering Interview Questions Electrical Engineering (16639)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)