Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

what are check points to be checked while charging
switchyard?(CT,PT,BREAKER,POWER TRANSFORMER)

Answer Posted / arun 9865576777

Transformer Commissioning Work


Preliminary Test

1. HT Switchgear End

&#61656; HT BKR IR Value

Open Condition Closed
Condition
R-RI= R-Y=
R-E=
Y-YI= Y-B=
Y-E=
B-BI= B-R=
B-E=


2. Transformer end

&#61656; TRF IR Value
Note: - Neutral earth should be open
LV line PT fuse& earth link open
15sec 60sec 600sec PI
HV-E
LV-E
HV-LV
After the above tests put back neutral earth line pt fuse&
earth link Connection properly.



3. LV Panel End

&#61656; LT BKR IR Value

Open Condition
Closed Condition
R-RI= R-Y=
R-E=
Y-YI= Y-B=
Y-E=
B-BI= B-R=
B-E=


Preliminary Checks

1. HT Switchgear End

&#61656; Check Relay Setting
&#61656; Check Tightness Of CT TB
&#61656; HT Cable Connection
&#61656; Interlock Trial
&#61656; Stability Check
&#61656; BKR Trial In Test Mode
&#61656; Check Fuse
&#61656; Check MTR Operation
&#61656; Reset The All Relay
&#61656; Check Control Supply
&#61656; Reset Max Value On Relay

2. Transformer End

&#61656; TRF Body Earth
&#61656; TRF Neutral Earth
&#61656; HT Cable Connection
&#61656; Check Tightness Of CT TB
&#61656; Check WTI,OTI (or) Door Inter Lock Trial
&#61656; Check OTI,WTI Setting
&#61656; LV Side Flexible Tightness
&#61656; Check Marshalling Box Control Supply



3. LV Panel End

&#61656; Check Relay Setting
&#61656; Check Tightness Of CT TB
&#61656; LV Side Flexible Tightness
&#61656; Check Line PT Fuse
&#61656; BKR Trial In Test Mode
&#61656; Check Control Fuse
&#61656; Check MTR Operation
&#61656; Check U/V Trip Throw Line PT
&#61656; Reset The All Relay
&#61656; Check Control Supply

Before Charging
&#61656; Line PT should be in service
&#61656; LV BKR should be open condition
After TRF Charging
&#61656; Note Down Electrical Parameter In HT Side & LT Side
&#61656; Phase Sequence In LT Side

Is This Answer Correct ?    1 Yes 1 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

In electrical what is earth(ground)connection, wht is the importance of it, why it is recomended to maitain below 3VAC between Neutral and earthspecially in PLC used machines?

2194


how braking & making capacity of circuit breaker are calculated?

2286


current transformer balance the power level on both sides. e.g in case of step up, at secondary side voltage rise but current decrease and vice versa in case of step down transformer. but how this power level remains same in case of current transformer and voltage transformer

1584


If only R Phase is connected in 2 pole elcb, n is not connected than it will work or not in ground fault.

1419


Mention the disadvantages of low power factor?

1105


1.What is the range of stator resistance of 3-phase induction motor? 2.Two electrically operated vibro motors are foxed in parallel direction in vibrating feeders. what is the direction of both vibro motors?

1875


How to calculate Ith (I thermal) for curent transformer

2063


why we have to particulary use ACB for below ratings,even available of MCB,MCCB with that range ?

2904


What is Traction? 1KVA Alternator, How much urrent taken?

2097


After completing iti in electrician, how can i get certificate of electrical supervisor? What ia requirements. For it?

1796


from generating station If 400v LT line length is 1000m how much voltage is drop and how do i calculate it? which cable will be use for this line?

2008


What is the two pole structure?

1915


detailed procedure how we calculate cost for pcc m10 and rcc m20 including centering and labour excluding steel/ iron

3111


Dear Sir I am living in Jaipur Rajasthan  now I did complete my b tech degree in electrical engineering in 2012  Sir how I gate certificate of competency for electrical supervisor

1980


What is the best thing to protect the motor from running over full current. CT or O/L or pressure transducer at the given pressure rating

1522