plz answer the questions, How do you check the quality of
foundation? and What is the key performance area in quantity
survey?
Answer / dinesh.rk
1>as you know the quality (strength)of foundation is assed
by testing that cube specimen and by quality control during
casting the foundation/
2> there is no such a particular area.. what we need is THE
ACCURACY SHOULD BE 100 % IN EACH AND EVERY ITEMS OF WORK/
| Is This Answer Correct ? | 7 Yes | 1 No |
why we leave expansion joint between to complex
how to estimate costing from quantity givin in BOQ and according to this how we fill tender and final rate for perticular work.....?
which "s the best wood for commercial purpose?
use ofr concrete as per grade ?
How to calculate concrete in percentage wise ,for example cement 18% sand 40% aggregate 40% and Stell 2% ,I need and??
what is cross hair cursor?
Define current ucs?
What is the actual formula to calculate dry consumption of 1cubic meter m20 Concrete???? Plzz tell seniors it is urgent..
hii.plz send me hpcl placement papers for officers trainees for graduate engg plz my email id is ajm_knit@yahoo.com
What is the bowing depth after stressing of PSC Girder of various spans and various dia of strands?
what happens when the curing is not done properly for structures ??
what is Quantity of stone and sand required for one cubic meter of stone work (UCR)
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)