which type of instrument included in plumbing work?name of
instrument?
No Answer is Posted For this Question
Be the First to Post Answer
For G+4 storied building having 76000 sft per each floor, can you prepare schedule in such a way that structure should be completed with in 41/2 months and finishing be completed with in 51/2 months?
what is castigliano theaorem
what is a civil enggineer ?
what is concrete
What is the ratio of cement, sand, aggregate of mix M25
20 Answers CCCL, Sarvottam Cement,
How to Calculate the amount of Cement mortor required only for 12 or 10 mm bonding? I mean to know only the amount of mortar for bonding not for plastering. Help me to find this.
how to calculate 1:1.5:3 ratio concrete cement, sand, metal and water please give me brief calculation
5 Answers DLF, Sobha Developers,
How many kilograms of 12 mm coarse aggregate required in cufic feet for one cubic meter of M25 grade concrete
concrete cube strength if fail 1 no in 7 days .What is the solution
what is the method used for marking of cantilevers in hirise buildings by using theodolite
What is the roll of face bars in beams
Instead of sand blasting is there any method to clean the rust of steel ???
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)