Answer / nag

Bill Of Quantity which is prepared at the moment of
erection and planned at supply of materials

Is This Answer Correct ?    10 Yes 0 No

what is BOQ? BOQ IS US IN ESTIMATE..

Answer / dinesh.rk

YES BOQ IS BILL OF QUANTITIES. BUT IT IS PREPERED BEFORE
THE EXECUTION - FOR TENDER PURPOSE OF THE PARTICULAR
PROJECT/

Is This Answer Correct ?    7 Yes 0 No

what is BOQ? BOQ IS US IN ESTIMATE..

Answer / mahendra

BOQ is Bill of Quantity.

Is This Answer Correct ?    6 Yes 0 No

what is BOQ? BOQ IS US IN ESTIMATE..

Answer / saumik mallick

BOQ stands for Bill of Quantity.
In BOQ the gross qty. of every item related to the execution
of work has given.
On the basis of that we can easily know that what is the
actual scope of work.
If any, executed qty. is more than the BOQ qty. they we can
submit the Deviation Statement. (Not applicable for Lump-Sum
Contract)

Is This Answer Correct ?    6 Yes 0 No

what is BOQ? BOQ IS US IN ESTIMATE..

Answer / yogesh babu

BILL Of Quantity

Is This Answer Correct ?    2 Yes 0 No

what is BOQ? BOQ IS US IN ESTIMATE..

Answer / vincent koil raj

bill of quantities (BOQ) An itemized list of materials, parts, and labor (with their costs) required to construct, maintain, or repair a specific structure

Is This Answer Correct ?    2 Yes 0 No

what is BOQ? BOQ IS US IN ESTIMATE..

Answer / t.nagarajan

BOQ Is Bill Of Quantity.

Is This Answer Correct ?    1 Yes 0 No

what is BOQ? BOQ IS US IN ESTIMATE..

Answer / qazi kamran yasin

bill of quantity.

Is This Answer Correct ?    0 Yes 0 No

Post New Answer

More Civil Engineering Interview Questions

how material can be calculate for brick work in 1:6

3 Answers   L&T,


what is the maximum number of course that can be laid according to IS code and the max height.

0 Answers  


what compressive strength of bricks?

4 Answers  


what"s the different between OPC (ordinary portland cement) and PPC (pozalana portland cement)?

3 Answers   Ashok Leyland, Marathon Realty,


Allowable wastage for ready mix concrete?

5 Answers   BBMP, L&T,






what is the minimum % of steel use in columns ?

7 Answers  


What is the permissible limit of silt contain in sand for rcc Work?

7 Answers   Ambuja,


WHAT DLC DESIGN IN CONSTRUCTION

0 Answers  


is their any instrument which can detect steel after casting of slab,etc. for verification of steel in slab,etc.

1 Answers  


Explain the term 'Gross unit rate' and identify the items that may be included in the gross unit rate.

1 Answers   NMN,


what is slope provided to floor?

3 Answers   Tulip,


how will deescribe pile foundation ?

4 Answers  


Categories
  • Civil Engineering Interview Questions Civil Engineering (5085)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4451)
  • Electrical Engineering Interview Questions Electrical Engineering (16632)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)