Answer Posted / nag
Bill Of Quantity which is prepared at the moment of
erection and planned at supply of materials
| Is This Answer Correct ? | 10 Yes | 0 No |
Post New Answer View All Answers
Define What is rigging?
Is it possible to make a feature using an overdefined sketch?
Required concret Surface Temperature prior to coating of epoxy pain with references ASTM or ACI whatever
one steel fixers how much ton steel fabrication he will do same how much tone he will binding?
Bitumen grades are 30-40,60-70, 80-100. what is mean by 30- 40
all technical question
What is portland cement
Pls provide me with the calculation or codes related to de- shuttering of flat slabs
How to make a c++ program that converts any base to base 10?
Tell me about triple point of water.
psc girder detail
What are moment of inertia and its importance in civil engineering?
what is the max. area can we apply the plate load test ?
States some of the commonly used commands in cad software’s?
What is the Hardness of M-40 grade concrete, general and theoratical