Answer Posted / saumik mallick
BOQ stands for Bill of Quantity.
In BOQ the gross qty. of every item related to the execution
of work has given.
On the basis of that we can easily know that what is the
actual scope of work.
If any, executed qty. is more than the BOQ qty. they we can
submit the Deviation Statement. (Not applicable for Lump-Sum
Contract)
| Is This Answer Correct ? | 6 Yes | 0 No |
Post New Answer View All Answers
what is modular brick and it size
How is calculate the cube molt
what is the specific gravity of rubble in plum concert
Scaffolding IS code NO.
Design a built-up column carrying an axial load of 1200 KN. Its length is 8m and it is effectively held in position at both ends and restrained against rotation at one end. Assume yield stress of 250 mpa
For the symmetrical continuous beam shown in figure, Prestressed with a force P = 1500 KN along parabolic curve as shown, compute the extreme fiber stresses over the central support for the uniformly distributed load of 24 kn/m. Use load balancing method.
how many tonnes equals to one cubic feet?
What is Critical path in Ms-Project ?
1.what type of the rock is most suitable for wet mix macadam in construction of road? 2.what is the highest maximum dry density and optimum moisture content can be acheive by using most suitable crush rock?
What is the Null Point of chimney in Power Plant
Define What is a kip?
How to calculate carrying capacity of the existing water supply trunkmain
what is the difference between natural draught cooling tower and induced draught cooling tower
why should we use 20mm graded metal only in vrcc?why we shouldnot use 40mm metal?
how to calculate rate analysys of 1:6 plastering 10 sq m