Answer Posted / mahendra
BOQ is Bill of Quantity.
| Is This Answer Correct ? | 6 Yes | 0 No |
Post New Answer View All Answers
How much cement and sand required for 9"brick wall per square metre
What Are The Steps Involved In The Concreting Process, Explain?
sir, please send me the web address of chennai railway to know the online examresults of junior engineer[civil].
A sieve analysis results in 100% retained in no. 50 Sieve, the fm is?
what is meant by residual strain?
What are some facts about concrete?
give me the mix proportion for design mix concrete M 7.5 grade 1:4:8
Please tell me the quantity of cement, sand, flyash, foaming agent required for 1 cubic meter of cellular lightweight concrete blocks. also , is there any admixtures required for the CLC blocks production.
What is different between DI Pipe and CI pipe?
does a b.tech civil engineer fresher supposed to know how to design rcc structure?
What is binding spacing of the rebars at lapping zones.
what are the types of design? which type of method is used at what type of design & why?
Define What are the reasons for geotechnical site investigations in Uganda?
The concrete slump recommended for beams and slabs; is?
which steel is better for residential building tmt steel or hysd steel