Hi i m B.E. In elect. & comm. I m workin in bio mass plant from 6 mnths as inst. Engg. but now i m in dept. Of operation as shift engg...which is best operation or inst. 4 me? M confusd..plz help and reply me..
Answers were Sorted based on User's Feedback
Answer / banerjeenandan
Being an Instrumentation Dept will be benifitial for you.
That is the core branch
Is This Answer Correct ? | 3 Yes | 0 No |
Answer / mithilesh kumar
hi..
for e&c point of view instrumentation maintenance far
better operation engg.
bcz if u r working operation department then in this field
not more future.
if u r working in C&I department then u can go any field
for maintenance.
so for instrumentation person work in field.
more query contact me.
mithilesh.barnwal30@gmail.com
Is This Answer Correct ? | 1 Yes | 0 No |
Can any body give detail about orifice sizing?
hello dear i have faced problem in drum level transmitter. the problem is when i engrize the meter meter shows 100% but the actual level 40 or something plz suggest me
Why is the length of cable layyed from RTD to temp. Transmitter should be minimum? Why does heating effect takes place in their?
1 Answers Process Control Technologies,
What is the difference bitween control net scaner and device net scaner
Calibration procedure for electro magnetic flow meter
What is the difference between a double acting and single acting positioner? what type of valves use single acting positioners?
1 Answers AquaTech, NamPower, Samson Resources,
what is the usage of QDV & VOLUME BOOSTER.
please tel me the calibration of pneumatic controler.
Why Flow measurement has to use Square Root
how to calibrate any tansmiter by loop or hart calibrator
what is the principal of coriolis mass flowmeter
Why we use 3-15 psi air for control valve input?