Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...


why substation are rated like 11KV or 33KV?

Answers were Sorted based on User's Feedback



why substation are rated like 11KV or 33KV?..

Answer / s

Because of form factor it is 1.11

Is This Answer Correct ?    38 Yes 3 No

why substation are rated like 11KV or 33KV?..

Answer / hkrish.eee

for our convinient

Is This Answer Correct ?    3 Yes 9 No

why substation are rated like 11KV or 33KV?..

Answer / selvin

the protection devices and loads are operating level based
design purpose

Is This Answer Correct ?    1 Yes 7 No

Post New Answer

More Electrical Engineering Interview Questions

ouestion for the post of section engineer

1 Answers   BSNL, RRB,


how will you calculate rated Primary and Secondary voltage and Current for 2500 KVA, 11kv/443V Transformer

2 Answers  


Whether the over frequency protection is turbine or alternator and why?

1 Answers   Marg,


Which capacitor is used in ceiling fans ?

1 Answers  


what use marshalling kishock in power transformer?

2 Answers  


i need previous entrence exam papers of nhpc.

0 Answers  


What will happen if 230V DC motor connected to 230V AC Supply?

15 Answers   Ashok Leyland, BOC, JSW, ONGC, RRB, TRB,


Why transformer ratings in KVA not in KW?

6 Answers   ABB,


What are the different circuits in thermal power plant?

0 Answers  


I have made a 3 phase thyristor full bridge rectifier. But at the moment it is working only for the half bridge operation. Both the half bridges are on operation separately but when i put it into full bridge operation the oscilloscope output is zero. I rechecked that the pulses are correct for each thyristor. what could be the possible reason for this?

0 Answers  


AMF (auto mains failure) control for DG sets at home.

1 Answers  


for 750 kw LT load what will be the ht kva

0 Answers   Sterling Tools,


Categories
  • Civil Engineering Interview Questions Civil Engineering (5086)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4456)
  • Electrical Engineering Interview Questions Electrical Engineering (16639)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)