Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...


how do i commission a distribution transformer knowing all
its ratings and transformation ratios?d



how do i commission a distribution transformer knowing all its ratings and transformation ratios?d..

Answer / aamod tripathi.

Commissioning a distribution transformer knowing all its
rating, Transformation ratio, Vector group, Phase sequence
is a skilled Job. You will need the information of complete
system like where the distribution transformer you are
talking about comes.

Information needed will be,

1. Single Line Diagram of the complete circuit (So as to
clearly understand the vector group/ rating of the
transformer to be installed, if there are many distribution
transformers to be installed in a locality).
2. Transformer foundation drawings and the drawings of
Bolts where the transformer will be bolted.
3. Whether to be installed on ground/ On pole
4. Whether oilfilled/ Drytype.
5. If oil filled provision of soakpit and clearances from
firewall.
6. If conservator tank and radiators are there the clearances
7. Provision for grounding.
8. All drawings of transformers from all angles.

Is This Answer Correct ?    6 Yes 0 No

Post New Answer

More Electrical Engineering Interview Questions

i want to know how to determine that a surge arrester work properly in 11kv system. and how to test a 12kv surge arrester

0 Answers  


Difference between Earthing Truck & Earthing trolly for HT panel

0 Answers   Moolchand Medcity,


the problem faced on star or delta winding connection??

0 Answers  


Is 3C x 2.5 Sqmm Cable can withstand 40Amp Starting current? If Yes then specify your ans.

2 Answers   NTPC,


can we use breather in a SEALED power or distribution transfomer instead of injecting nitrogen.

1 Answers  


What is the Gap Should maintain for HT cables crossing of LT Cable?

2 Answers  


If an electrical component has a positive temperature coefficient, how come such components have high power losses due to heat if current decreases when resistance increases? assuming power given by I^2*R whereby the Resistance is infinite.

0 Answers  


What is FM 200?

2 Answers   Dalkia,


if i have 5kw,9A,three phase induction motor,if i want to install it 100 meter away from its feeder,how i will culculate cable size for this load.

2 Answers  


why 5kW motor becomes unbalance if its relay trip 1st time and its set value is 7.0 A

0 Answers  


What is reactive power and where it is used.

0 Answers  


The electromagnetic torque developed is proportional to what in a D.C series motor?

0 Answers   HPCL,


Categories
  • Civil Engineering Interview Questions Civil Engineering (5086)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4456)
  • Electrical Engineering Interview Questions Electrical Engineering (16639)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)