Commissioning a distribution transformer knowing all its
rating, Transformation ratio, Vector group, Phase sequence
is a skilled Job. You will need the information of complete
system like where the distribution transformer you are
talking about comes.
Information needed will be,
1. Single Line Diagram of the complete circuit (So as to
clearly understand the vector group/ rating of the
transformer to be installed, if there are many distribution
transformers to be installed in a locality).
2. Transformer foundation drawings and the drawings of
Bolts where the transformer will be bolted.
3. Whether to be installed on ground/ On pole
4. Whether oilfilled/ Drytype.
5. If oil filled provision of soakpit and clearances from
firewall.
6. If conservator tank and radiators are there the clearances
7. Provision for grounding.
8. All drawings of transformers from all angles.
| Is This Answer Correct ? | 6 Yes | 0 No |
Post New Answer View All Answers
What we mean by vintage of an engine+Generator?
I have an existing old MCCB. ABB Model SACE, the rating are: Ue = 660 volts, Iu =1250 Amps, 3 poles, Ith (max) =800 amps at 45 deg C. I need a circuit breaker for my 3 phase motors, 380 volts 60 hz. the supplier required the minimum ampacity of the breaker to be 911 amps. can i use this breaker with rating of Iu =1250 amps but Ith = 800amps maximum?
How to calculate earth wire load by formula
What is tan delta & PPM in transformer? and whats its IS value?
Why transformer used in UPS??
Name a govt approved university which have 100% online engineering course.
(1)The demand for electricity , the amount of renewable generation available, the amount of fossil fuel generation available and the cost of the fossil fuel generation are shown in table below period(hrs) demand(MW) renewable (MW) fossil- fuel(MW) cost of fossil fuel(MW) 00.00 - 01.00 2000 1800 2000 30 01.00 - 02.00 2300 2500 2000 30 02.00 - 03.00 2500 2700 2100 45 03.00 - 04.00 2900 3100 2100 50 04.00 - 05.00 2700 2600 2500 45 05.00 - 06.00 2400 2000 2700 50 06.00 - 07.00 2200 1800 2000 36 07.00 - 08.00 2100 1600 2000 36 Assuming that the renewable generation incurs zero cost, determine an optimal generation schedule(specifying the amount of renewable generation and fossil fuel generation used in each period, the cost for each period and the overall cost for 8 hours.)
what is booster? and how it is connected in a circuit?
What is an alternator impedance value?
Why derating factor os applied on Cables?
what is a pulse transformer? how rise time of pulse changes when ever the voltage changes?
What is center gravity load in substation?
Transformer how to maintaince a check b check c check d check
DERIVE AN EXPREION FOR MAXIMUM POER TRANSMISSION, WHAT ARE ITS APPLICATIONS.
Hello Guys !! i want to rrb section engineer electrical(signal) previous model papers? any body help me?