what is the allowable silt % in river sand for Dam
concreting.
Answer Posted / mohd sameer khan
7 % of silt is allowed.
| Is This Answer Correct ? | 1 Yes | 0 No |
Post New Answer View All Answers
Write short note on construction programme for pile foundation.
What expenses counted in contingencies and how much it is in related to built-up area of the building.
What is meant by a context menu in a cad software?
what quantities of work done in terms of sq.mts/day/ of 8hrs for each varpenter (shuttering) and Steel fitter in terms of Tonnes. For slabs, Columns etc.?
How much percentage of brick bats allowed in CD-75 bricks
How to check slab shuttering level.? Or check list for slab ?
What are some facts about concrete?
what will be the total emoluments for deputy surveyor in APPSC in the payband of ( 9460-27600). please give me the detailed information step wise?
for a column of size 400*230mm column reinforcement= 8-20x(cant write the symbol,i hope u guys undersstand,something like (fi) column stirups=8x@(4l) 230c/c 1)what does these mean 2)how to calculate quantity of steel for this column(ceiling height 11 ft)
how many time use of plywood shuttering and IS code
How do you convert wind speed into force?
if i used salt as a add mixture in concrete, then what will happen and what are the naturally available add mixtures.
What are the applications of cad?
How many days should curing of plastering, brick work and concrete
what r the precaution for high in atp tempareture,low in atp tempareture