what is the allowable silt % in river sand for Dam
concreting.
Answer Posted / sjtbehera
it is 3%
| Is This Answer Correct ? | 2 Yes | 3 No |
Post New Answer View All Answers
What are the govt approvals required for starting of power project. means from initial site grading and excavation work.exm. blasting in hard rock, deep excavation, cut off trees from site.
If we don't have drawing for Excavation of building,At what rule we will go for excavation and how much depth will go for a villa?
What is the method of soil replacement test?
can we use PPC for concrete wall, If yes, what is the concrete (PPC & OPC) grade for Non- load bearing concrete wall, load bearing concrete wall & for cellar retaining wall.
How to calculate ventonite bag in pile ( pile depth 25 m dia 1m)
what do you understand by M25 concrete
TELL ME THE EQUATION FOR OGEE SPILLWAY
Explain how you can turn off the display for dimension in CAD?
What are new methods /technologies of pothole patching?
Where is the worlds longest elevator and how long is it?
Define What is the distance between railway tracks?
Formula of area of crane hook
Bitumen grades are 30-40,60-70, 80-100. what is mean by 30- 40
is there any influence of water(used for mixing of concrete) on a weight of harndend concrete.
Why reinforcement done in shorter span in two way slabs