Answer Posted / bishwa mohan thakur
slump test measure the consistency of concrete.It measure the flow of concrete and the work-ability of concrete.We also know the water cement ratio in concrete.It is measure in millimeter(mm).It is measure in the slump cone after the concrete lay in the cone in three layer and each layer we temper 25 times.If we require concrete in pipe line slum value should be 100-120mm and if we directly pour the concrete the slump value should be 80-100mm
Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
Rate analysis of Vitrified tile in cement mortor 1:3
how to preaper for interview wat they asked in interview give me idea
How can calculate the requirement of steel bars of rcc slab for 1100 sq ft?
pls send me interview question paper with answer of EIL/AAI/UPSC/RPSC because i am doing prepration of compitation exam of UPSC for the Asst. Executive Engineer
How much quantity water should be placed in one cubic meter area?
How much of fly ash is allowable in Portland cement and what is the disadvantage when the level of fly ash is increased?
What are the methods of measurement? Describe it shortly
How much area will be covered in 1 litre of Velvet touch paint in normal wall condition
how to calculate weight of 1.8 cum of aggregate
for a column of size 400*230mm column reinforcement= 8-20x(cant write the symbol,i hope u guys undersstand,something like (fi) column stirups=8x@(4l) 230c/c 1)what does these mean 2)how to calculate quantity of steel for this column(ceiling height 11 ft)
How will be cutting in timber plate size 600*400 column size
please give me the rates of RCC(CUM), PCC(CUM), Brick Work(CUM), Tile Flooring, Saria Shuttering
how much used soil in 1 brick of standard size?
what is mean by reestimation?