How to calculate the individuals quantities of cement,sand,and aggregate
having 1:2:4 ratio for 50 cubic meter area.
Answer / palguna
The proportions of
cement-1 ,sand -2 aggregate-4, the sum of total aggregates is 7
the volume of wet cement concrete is 1.54 to 1.57
then the solution is cement = 1x1.57x1440/7= 322.57 kg
(here 1440 is density of cement
for sand = 2x1.57/7=0.4485 cum
aggregate = 4x1.57/7=0.897 cums
| Is This Answer Correct ? | 8 Yes | 4 No |
how to calculate the amount of cement & sand required for plastering
Adout concrete
How much time Required for PPR pipe network testing
what is the used civil engg?
what is diversion?
why demand factor less then 1 ?
What is the minimum size of the particles of silt soil?
what is DLC
indiploma civil engineering student r studied is456-1978. but in practicial we r using 2000 version i think 1978 version didn't use the student. any openion?
What Is the Thumb rule to calculate depth and dia of pile required to carry specified load on differeent soil
What is the nature of duties & responsibilites senior civil engineer ?what is self confident & satisfaction should be a senior civil engineer?
how to calculate the size of triangular ring in rcc column?
0 Answers Prime Perfect Buildcon,
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)