how the calculation is done if the DG set require for the --
-48 to -51v 4000 ah battery set .
Answer / k.prakashchandra
Generally ,the charging rate should be at least 10 % of AH
of the battery set numerically,so that full charging time
will not exceed 10 hours.
| Is This Answer Correct ? | 2 Yes | 0 No |
what are the principles of a booster converter?
How to get Electrical Supervisory Licence in chennai Tamil Nadu from TNEB. I am BE EEE graduate.
Compare OH Transmission & UG Transmission?
why using eleven's multiple for substations?
What is the field weakening mode of a ac motor?
Generation of voltage for each phase are same of a turbogenerator.Although the short circuit current flow when two phase of turbogenerator are shorted(where current can't flow without potential difference),why?
please tell me formula of 3 phase induction motor under condition{1]when we 3 phase motor starts without load in star or delta connection?thanks
is the value of inductance depends upon the evalue of thitha in doubly excited machine?
how to convert the KVAR to microfarad??????????????????
What is Generator Protection & Transformer Protection?
I am having a DG set.The 415 V from Generator is step up to 460 v and then the same is used for Induction furnace. before Step up, I am connecting LT load to my factory use. When Induction furnace is in service from DG, when i try to start a motor, the generator is tripped.Please tell me the reason.
Difference between shunt, PMG and AREP excitation. Which is the most reliable between PMG and AREP.
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)