Answer / k.prakashchandra
Generally ,the charging rate should be at least 10 % of AH
of the battery set numerically,so that full charging time
will not exceed 10 hours.
| Is This Answer Correct ? | 2 Yes | 0 No |
How can we Run three phase motor when only single or two phase supply is available ??
Single line digram for 11 kV to distribution use go,la and do
What is ELCB?
After synchronization with grid how to maintain the power factor in lagging or in leading? if lead of lag what is the problem?
What is bushing?
advantages of vvvf drives over non vvvf drives for EOT cranes
why there is 1 phase and 3 phase but not 2 phase and 4 phase?
How to reduce -234126219.6403 MVAr generation and by what?
what happens if we give 1-ph supply for 3-ph Bridge rectifier...??
how to calculate the fault in substation
how to find the ballast lost from the actual wattage? for example i am going to buy decorative type 2x36watts fluorescent light fitting for this lamp how to find the ballast lost? is there any formula?
Explain about how is it working Earth fault'relay and wahts the resistance value of earth bed
Civil Engineering (5086)
Mechanical Engineering (4453)
Electrical Engineering (16638)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)