why there is 1 phase and 3 phase but not 2 phase and 4 phase?
Answers were Sorted based on User's Feedback
There is 2phase supply, but it is dedicated only to the railways not for commercial and domestic use. and about 4phase, it's not Indian standards, and more conductors are required and structure of transmission tower will be huge in case for 4phase.
| Is This Answer Correct ? | 11 Yes | 0 No |
Answer / naresh
As Ram kumar says i.e. there is more no. of conductor will
required for more no. of phases is correct,and also for
large load we require more power which can be generated by
only three phase motor and a large kw motor cant be started
by single, two and foure phases, it required leading or
laging power which is only possible with three phase.
| Is This Answer Correct ? | 6 Yes | 0 No |
What is the difference between voltage transformer and potential transformer?
38 Answers ABB, ETA, Maritime Academy, MSEB, Reliance Jio, Voltas, Wipro,
WHAT IS PRINCIPLE OF TRANSFORMER
I have a 1000 kVA Transformer(11kV/0.415kV) and a APFC panel of 400 kVAR(LT).Now if i want to remove the LT APFC panel and install a HT(11kV) APFC panel on the HT side is the HT APFC panel will work same as the LT APFC panel(improve the power factor),if yes what will be rating of the HT APFC panel?what is the formula to calculate HT APFC panel rating???
Can I use star delta connected induction motor for dual supply voltage?
What is the Impedance, inductive reactance calculations
what is the UPS
Dear all i want to know SEWA Electrical Supervisor Licence test Previous Year Questions ? If any body know please send to me zohairaukllah@yahoo.com
what are the protections used in power transformers of 5 mva and above
What si the d/f b/w KVA & KWH, kvarh & kvar, kwh & kvar phase voltage & line voltage
What is metering cubical? What is the use?
what is KSR type transmission tower? What is LSR type transmission tower?
Is it possible to measure correct value of earth resistance & cable insulation ristance with out disconncting earth lead & both sides of cable ends? If not, any other method to measure ER & CIR with out disconneting from the system.
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)