Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...


I





If i have 2kv ups in which 38Amp *8battries hou many hour's
back up i get from 600Watts



Answers were Sorted based on User's Feedback



I If i have 2kv ups in which 38Amp *8battries hou many hour's back up i get from 60..

Answer / k.prakashchandra

2 KVA UPS, 8 batteries of 38 AH and 12 V and load 600W. The
back up time = 8 x 38 x 12 /600 = 6 Hour (app)

Is This Answer Correct ?    1 Yes 0 No

I If i have 2kv ups in which 38Amp *8battries hou many hour's back up i get from 60..

Answer / kalpesh m. shah

2 KVA UPS, 8 batteries of 38 AH and 12 V and load 600W. The
back up time = 8 x 38 x 12 /600 = 6 Hour (app)
In single phase output voltage is 230V AC so you can
considerd back up time is = ( 8 Batteries X 38 Ah X 12
Volts / 2.6A Load X 230 V Output )X 60% backup = 3.66 Hour
Successfully working.
In Single phase W = V X I
Watt = 600
Voltage = 230
So, Current is 2.6A.

Is This Answer Correct ?    1 Yes 0 No

Post New Answer

More Electrical Engineering Interview Questions

What is mean by STUB protection?

0 Answers  


How can calculate ups battery back up time?

25 Answers   Cisco, Cooper, Pronet, Wipro,


Why only mesh earthing is used in G.S.S.?

2 Answers  


why making capacity is more than breaking capacity?

14 Answers   Essar, Indo Asian, Infinity,


Where double earthing is required? Is there any power specification to have double earthing?

10 Answers   Delphi,


A 6.6 KV/ 440V Xformer. what are the imporatant parts & equipment required for it's protection panel.

0 Answers   APTransco,


respetsed sir, i have applied for section engg and juniour engg for both chennai and tiruvunabthapur boards for electrical deportments . can u suggest what books i have to follow and and also from which sections they r going ask (i mean weightage and what topics i have to cover) for both se and je for both chennai and tiruvunanthapur boards.......

1 Answers  


physical identification of HT & LT panel

0 Answers   Schneider,


how many electricity poles are there and what are the names and their sizes.

0 Answers  


What can be a rating of a transformer(KVA) if the load is about 1000KW?illustrate by showing formula?

2 Answers  


What are formula we can apply to determine the HT/LT current of 11KV/433V transformer except KVA/LV×√3. ?

2 Answers  


What should be the length of transmission line so that we can see/obtain the full sine wave of voltage??

0 Answers   Siemens,


Categories
  • Civil Engineering Interview Questions Civil Engineering (5086)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4456)
  • Electrical Engineering Interview Questions Electrical Engineering (16639)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)