a) we have 30nos., 300mm dia, 4m length double under
reamed piles.calculate excavation quantity.b) tell
concrete qty. also.
Answer / bharath m
Hai,
Please find the answers below.
a)Excavation quantity
Straight pile = 3.14/4*.3*.3*4*30 = 8.49 Cum. +
Under reamed portion (2 Nos. per pile) = 2*3.14*.318*(.2)*.225*2*30 = 5.39 Cum. Total = 8.49+5.39 = 13.88 Cum.
b)Concrete quantity
as same as item (a) above.
Bharath M
Tamil Nadu
8438238335/9980644165
| Is This Answer Correct ? | 3 Yes | 7 No |
What is gauge and gage
how can change 10mm dia @275 c/c bar spacing to 12 mm
What are types of mixs ?
What is meant by Anchorage length? Development Length?
HOE TO YOU PLAN TO ACCHIEVE THE GOALS?
what is the meaning fe in steel?
1 Answers Manjeera, Oceanus, PAN, URC Construction,
percentage of steel in one cubic meter of concrete
how clculate excavated or backfilling quantity by simpson's rule
explain water proofing in toilets and terrace
Please design 12.5m long dubbly beam
0 Answers Aarya Construction Design,
What are the joints wants to made in masonry where door opening, arches like etc..
What is the rate of earthwork excavation?
Civil Engineering (5086)
Mechanical Engineering (4453)
Electrical Engineering (16638)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)