a) we have 30nos., 300mm dia, 4m length double under
reamed piles.calculate excavation quantity.b) tell
concrete qty. also.
Answer / bharath m
Hai,
Please find the answers below.
a)Excavation quantity
Straight pile = 3.14/4*.3*.3*4*30 = 8.49 Cum. +
Under reamed portion (2 Nos. per pile) = 2*3.14*.318*(.2)*.225*2*30 = 5.39 Cum. Total = 8.49+5.39 = 13.88 Cum.
b)Concrete quantity
as same as item (a) above.
Bharath M
Tamil Nadu
8438238335/9980644165
Is This Answer Correct ? | 3 Yes | 7 No |
why hanger rods are used in beam
A ground is nonengginered fill 15 years back; how we can find the level of consolidation and bearing capacity
Explain the benefits of using standard terminology in the measurement process?(Tendering and estimation)
225 mm thick RCC slab, how many ton load slab can carry? for example if 33 ton truck loaded with soil, truck having 6 wheels. slab can take load or not? grade of concrete is M35 and slab design Fe500, slab desing one way slab.
is there any thumb rule for calculating construction cost of the building with pile foundation per sft. area?
how much binding wire is required for one tone steel
20 Answers Gammon, Hinduja, Jindal,
What is the best type of wood glue?
what is the weight of 12 mm 40 mm aggregate?
Sir what reason the deshuttring of column 1 day after casting and slab deshuttring time 14 days after casting
What is the largest concrete dam in the world?
what is the proedure to do soundness test in cement? What is the maening of soundness? Why we do it for cement?
Why reinforcement done in shorter span in two way slabs
0 Answers Osmani Constructions,