a) we have 30nos., 300mm dia, 4m length double under
reamed piles.calculate excavation quantity.b) tell
concrete qty. also.
Answer / bharath m
Hai,
Please find the answers below.
a)Excavation quantity
Straight pile = 3.14/4*.3*.3*4*30 = 8.49 Cum. +
Under reamed portion (2 Nos. per pile) = 2*3.14*.318*(.2)*.225*2*30 = 5.39 Cum. Total = 8.49+5.39 = 13.88 Cum.
b)Concrete quantity
as same as item (a) above.
Bharath M
Tamil Nadu
8438238335/9980644165
| Is This Answer Correct ? | 3 Yes | 7 No |
What is the weight of std brick and 6" ,8",4" solid block...?
tell me how to calculate by weight and by volume the quantity of cement sand mortar of 1:2
If we know the N - Value of soil and required bearing capacity how do we know what diameter and length of pile to be casted? How can we check whether the dia. and lenght of pile we have selected are most economical onse?
What is a projection line?
Mention what are the composition of a landfill?
What should be the Slump(Min.)in cement in concrete in all grades of concrete?
what is pmc(in rigid pavement)
WHAT WII BE THE WATER ABSORPTION POWER OF WOOD ?
how preparing for barbending schedule ? how to preparig for two leged stirrups?
What is the significance of Hook's in stirrups.
can i place column steel lapping in floor beam? my lapping is 24 inches in floor beam and 24 inches on floor beam
what is the method of all soil testing in lab?
Civil Engineering (5086)
Mechanical Engineering (4453)
Electrical Engineering (16638)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)