a) we have 30nos., 300mm dia, 4m length double under
reamed piles.calculate excavation quantity.b) tell
concrete qty. also.

Answers were Sorted based on User's Feedback



a) we have 30nos., 300mm dia, 4m length double under reamed piles.calculate excavation quantity.b..

Answer / Arpit Gupta

To calculate the excavation volume for the given pile, you'll first need to find its cross-sectional area and then multiply it by the length of the pile:na) The cross-sectional area of a cylinder can be calculated using πr² (pi times radius squared). Since the diameter is given as 300mm, the radius is 150mm. However, since the piles are double under reamed, their actual cross-section might be smaller than that of a simple cylinder. To account for this, you'll need to find the exact cross-sectional area or consult with an engineer familiar with the specifics of pile design.nOnce you have the cross-sectional area (let's assume it's A), the excavation volume can be calculated as V = AL (cross-sectional area times length).nb) To calculate the concrete quantity, first find the excavated volume (V) from part a). Then, assuming that the void spaces between the soil and the pile are filled with concrete, you'll need to determine the required concrete volume for filling these gaps (let's assume it's Vc). Keep in mind that the final concrete volume might be different if the pile design includes other materials like reinforcement or grout.

Is This Answer Correct ?    0 Yes 0 No

a) we have 30nos., 300mm dia, 4m length double under reamed piles.calculate excavation quantity.b..

Answer / bharath m

Hai,
Please find the answers below.
a)Excavation quantity
Straight pile = 3.14/4*.3*.3*4*30 = 8.49 Cum. +
Under reamed portion (2 Nos. per pile) = 2*3.14*.318*(.2)*.225*2*30 = 5.39 Cum. Total = 8.49+5.39 = 13.88 Cum.
b)Concrete quantity
as same as item (a) above.

Bharath M
Tamil Nadu
8438238335/9980644165

Is This Answer Correct ?    3 Yes 7 No

Post New Answer

More Civil Engineering Interview Questions

Ihave 230mm *115mm * 75mm brick calculation in cft and 115mm brick calculation in sft

4 Answers  


How do we calculate the weight of aggregates, sand and cement M 25 design mixfor 1 cum

1 Answers  


What are the ingredients of pre-stressed concrete?

1 Answers  


Can anybody explain with the help of sketeches that what are 2legged , four legged & 6legged stirrups and how to calculate cut length of diamond ring(stirrups)?

3 Answers  


what are RIB slabs explain about it

1 Answers   L&T, NCC,


in moon night and stars r shining with moon n u stand n lloking towards sky if u have no copass, and no any other civil lab equipment, then how u point out the North direction for serveying??

2 Answers  


what is steel consumption for high rise building column, beam, slab,footing

5 Answers  


how many days we should curing for plastering,brickwork,concrete?

10 Answers   Al Faraa, Alfaraa, CCCL, Consolidated Construction Consortium Limited, Wipro,


methode of psc girder stressing

2 Answers   Bechtel, Simplex,


five benefits of using standard terminology in the measurement process

1 Answers  


What is line killa

1 Answers   NBPL,


How much actual % of wastage of steel.

5 Answers   NICE,


Categories
  • Civil Engineering Interview Questions Civil Engineering (5086)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4453)
  • Electrical Engineering Interview Questions Electrical Engineering (16638)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)