Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...


a) we have 30nos., 300mm dia, 4m length double under
reamed piles.calculate excavation quantity.b) tell
concrete qty. also.



a) we have 30nos., 300mm dia, 4m length double under reamed piles.calculate excavation quantity.b..

Answer / bharath m

Hai,
Please find the answers below.
a)Excavation quantity
Straight pile = 3.14/4*.3*.3*4*30 = 8.49 Cum. +
Under reamed portion (2 Nos. per pile) = 2*3.14*.318*(.2)*.225*2*30 = 5.39 Cum. Total = 8.49+5.39 = 13.88 Cum.
b)Concrete quantity
as same as item (a) above.

Bharath M
Tamil Nadu
8438238335/9980644165

Is This Answer Correct ?    3 Yes 7 No

Post New Answer

More Civil Engineering Interview Questions

What is gauge and gage

2 Answers  


how can change 10mm dia @275 c/c bar spacing to 12 mm

4 Answers   MEIL,


What are types of mixs ?

3 Answers   L&T,


What is meant by Anchorage length? Development Length?

10 Answers   HSCC, VHR,


HOE TO YOU PLAN TO ACCHIEVE THE GOALS?

0 Answers  


what is the meaning fe in steel?

1 Answers   Manjeera, Oceanus, PAN, URC Construction,


percentage of steel in one cubic meter of concrete

1 Answers   Jacobs Zate,


how clculate excavated or backfilling quantity by simpson's rule

0 Answers   Jaypee,


explain water proofing in toilets and terrace

2 Answers   L&T,


Please design 12.5m long dubbly beam

0 Answers   Aarya Construction Design,


What are the joints wants to made in masonry where door opening, arches like etc..

0 Answers  


What is the rate of earthwork excavation?

5 Answers   Tata Steel Limited,


Categories
  • Civil Engineering Interview Questions Civil Engineering (5086)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4453)
  • Electrical Engineering Interview Questions Electrical Engineering (16638)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)