a) we have 30nos., 300mm dia, 4m length double under
reamed piles.calculate excavation quantity.b) tell
concrete qty. also.



a) we have 30nos., 300mm dia, 4m length double under reamed piles.calculate excavation quantity.b..

Answer / bharath m

Hai,
Please find the answers below.
a)Excavation quantity
Straight pile = 3.14/4*.3*.3*4*30 = 8.49 Cum. +
Under reamed portion (2 Nos. per pile) = 2*3.14*.318*(.2)*.225*2*30 = 5.39 Cum. Total = 8.49+5.39 = 13.88 Cum.
b)Concrete quantity
as same as item (a) above.

Bharath M
Tamil Nadu
8438238335/9980644165

Is This Answer Correct ?    3 Yes 7 No

Post New Answer

More Civil Engineering Interview Questions

why hanger rods are used in beam

3 Answers  


A ground is nonengginered fill 15 years back; how we can find the level of consolidation and bearing capacity

2 Answers  


Explain the benefits of using standard terminology in the measurement process?(Tendering and estimation)

0 Answers  


225 mm thick RCC slab, how many ton load slab can carry? for example if 33 ton truck loaded with soil, truck having 6 wheels. slab can take load or not? grade of concrete is M35 and slab design Fe500, slab desing one way slab.

0 Answers  


is there any thumb rule for calculating construction cost of the building with pile foundation per sft. area?

0 Answers  






how much binding wire is required for one tone steel

20 Answers   Gammon, Hinduja, Jindal,


What is the best type of wood glue?

0 Answers  


what is the weight of 12 mm 40 mm aggregate?

2 Answers   SCON,


Sir what reason the deshuttring of column 1 day after casting and slab deshuttring time 14 days after casting 

1 Answers   Saudi Oger,


What is the largest concrete dam in the world?

0 Answers  


what is the proedure to do soundness test in cement? What is the maening of soundness? Why we do it for cement?

1 Answers  


Why reinforcement done in shorter span in two way slabs

0 Answers   Osmani Constructions,


Categories
  • Civil Engineering Interview Questions Civil Engineering (5085)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4451)
  • Electrical Engineering Interview Questions Electrical Engineering (16632)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)