a) we have 30nos., 300mm dia, 4m length double under
reamed piles.calculate excavation quantity.b) tell
concrete qty. also.
Answers were Sorted based on User's Feedback
Answer / Arpit Gupta
To calculate the excavation volume for the given pile, you'll first need to find its cross-sectional area and then multiply it by the length of the pile:na) The cross-sectional area of a cylinder can be calculated using πr² (pi times radius squared). Since the diameter is given as 300mm, the radius is 150mm. However, since the piles are double under reamed, their actual cross-section might be smaller than that of a simple cylinder. To account for this, you'll need to find the exact cross-sectional area or consult with an engineer familiar with the specifics of pile design.nOnce you have the cross-sectional area (let's assume it's A), the excavation volume can be calculated as V = AL (cross-sectional area times length).nb) To calculate the concrete quantity, first find the excavated volume (V) from part a). Then, assuming that the void spaces between the soil and the pile are filled with concrete, you'll need to determine the required concrete volume for filling these gaps (let's assume it's Vc). Keep in mind that the final concrete volume might be different if the pile design includes other materials like reinforcement or grout.
| Is This Answer Correct ? | 0 Yes | 0 No |
Answer / bharath m
Hai,
Please find the answers below.
a)Excavation quantity
Straight pile = 3.14/4*.3*.3*4*30 = 8.49 Cum. +
Under reamed portion (2 Nos. per pile) = 2*3.14*.318*(.2)*.225*2*30 = 5.39 Cum. Total = 8.49+5.39 = 13.88 Cum.
b)Concrete quantity
as same as item (a) above.
Bharath M
Tamil Nadu
8438238335/9980644165
| Is This Answer Correct ? | 3 Yes | 7 No |
Ihave 230mm *115mm * 75mm brick calculation in cft and 115mm brick calculation in sft
How do we calculate the weight of aggregates, sand and cement M 25 design mixfor 1 cum
What are the ingredients of pre-stressed concrete?
Can anybody explain with the help of sketeches that what are 2legged , four legged & 6legged stirrups and how to calculate cut length of diamond ring(stirrups)?
what are RIB slabs explain about it
in moon night and stars r shining with moon n u stand n lloking towards sky if u have no copass, and no any other civil lab equipment, then how u point out the North direction for serveying??
what is steel consumption for high rise building column, beam, slab,footing
how many days we should curing for plastering,brickwork,concrete?
10 Answers Al Faraa, Alfaraa, CCCL, Consolidated Construction Consortium Limited, Wipro,
methode of psc girder stressing
five benefits of using standard terminology in the measurement process
What is line killa
How much actual % of wastage of steel.
Civil Engineering (5086)
Mechanical Engineering (4453)
Electrical Engineering (16638)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)