Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...


What is line killa



What is line killa..

Answer / vijay kumar negi

beam bottam to slab bottam we make beam sides .
beam bottam to slab bottam langth we called line killa.
like beam{300*500} slab thikness is .125mm than our line killa is .375mm.

Is This Answer Correct ?    0 Yes 0 No

Post New Answer

More Civil Engineering Interview Questions

Are you having any structural design experience?

4 Answers   Ajnara Group, Jeyam Homes, L&T,


percentage of metal,clay or soil & water in water bond macadam roads to know the quantities for each in total volume of 11500 cubic meters

0 Answers  


What is meant by cartesian coordinate system?

0 Answers  


How i calculate Cement sand Quantities in 100 Sq.ft Plaster?

1 Answers   ABC,


volume of one cement bag

4 Answers   Grand Peaks, Omace, Swasudha Infra,


how to start basic designing in structure..procedure to knw basic start to do structural designs in civil field?

2 Answers  


What is meaning of FREE STANDING STAIRCASE ?

0 Answers   UPCL,


How to calculate chejja reinforcement

0 Answers   Grow Homes,


It needs contour survey before plastering a wall / column & floor tiles setting to get––

1 Answers  


How we can calculate the quantity of sand, & cement, & also aggregate for a slab. Length 25'/3.28 = 7.62 Mtr width 20'/3.28 = 6.09 Mtr depth 6" /3.28 = 0.152 Mtr

2 Answers  


how to calculate the quantity of steel in a slab , beam and coloumn

2 Answers   L&T,


How can we cross check the excavation and backfilling quantities.

3 Answers  


Categories
  • Civil Engineering Interview Questions Civil Engineering (5086)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4453)
  • Electrical Engineering Interview Questions Electrical Engineering (16638)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)