a) we have 30nos., 300mm dia, 4m length double under
reamed piles.calculate excavation quantity.b) tell
concrete qty. also.
Answer Posted / bharath m
Hai,
Please find the answers below.
a)Excavation quantity
Straight pile = 3.14/4*.3*.3*4*30 = 8.49 Cum. +
Under reamed portion (2 Nos. per pile) = 2*3.14*.318*(.2)*.225*2*30 = 5.39 Cum. Total = 8.49+5.39 = 13.88 Cum.
b)Concrete quantity
as same as item (a) above.
Bharath M
Tamil Nadu
8438238335/9980644165
| Is This Answer Correct ? | 3 Yes | 7 No |
Post New Answer View All Answers
what is the ingredient value of 40mm and 20mm aggregates?
What is the difference between Hinged and pinned in Column ends
Different sizes of Hollow blocks and its weight. Thanks.
What is the difference between 53 grade and 43 grade cement
what is right & short method of measurement of slab&beam
How much quantity of cement and sand required for the inlining of 610mm dia MS pipe 8.7mm thk.Inlining thickness is 10mm and CM ratio is 1:1.5.
What is made from large rocks, which protects the base of cliffs?
Why nautical mile is different from statute mile?
While calculating the weight of the steel per running meter, the formula used is [(dxd)/162]. Why 162 is used in denominator & how it is derived?
What black man invented the clothes dryer?
What is the diff b/w ROAD TUNNEL & RAILWAY TUNNEL ??
For what purpose bedding is used under storm water drains, explain?
why is M30 grade Concrete use for Foothing & Column M50
how much quantity of cement,sand and water required for 1 sq feet flooring work .
Explain the various stages of the project planning process in construction?