a) we have 30nos., 300mm dia, 4m length double under
reamed piles.calculate excavation quantity.b) tell
concrete qty. also.
Answer Posted / bharath m
Hai,
Please find the answers below.
a)Excavation quantity
Straight pile = 3.14/4*.3*.3*4*30 = 8.49 Cum. +
Under reamed portion (2 Nos. per pile) = 2*3.14*.318*(.2)*.225*2*30 = 5.39 Cum. Total = 8.49+5.39 = 13.88 Cum.
b)Concrete quantity
as same as item (a) above.
Bharath M
Tamil Nadu
8438238335/9980644165
Is This Answer Correct ? | 3 Yes | 7 No |
Post New Answer View All Answers
how to calculate detail quantity of bricks and mortar for 500 cu.ft masonry work. consider wall thickness 9 inches
What is the compressive strength of fly ash bricks?
I measured pcc work as 15.34 m cube , the ratio is 1:5:10 ,want to know the cement, sand and metal used for pcc measured as 15.34 m cube at this ratio.
How to Calculate Materials Required for PCC 1:4:8 for 1Cum & Brickwork 1:4 for 1Cum & Plastering 1:4 (15mm Thick) for 100Sqm & RCC 1:4:8 & 2mt ( L1=1mt & L2=1mt ) length of 12mm Steel bended in 90degrees what is the formula to calculate Weight & Actual Length ?
wat would be the probable interview questions and GD topics for IOCL exam?
what are the code used for residental building?
Journal entry Gross salary 10000 Tax 1000 Employee contribution 2000 Employer contribution 2000
There are two buildings one taller and one shorter whose time period will be grater and similarly the frequency ?
how many running meters in one kilogram of 4mm pvc coated chainlink fencing
What are the main reasons for conducting pull-out tests for soil nails?
to draw bm diagrams for portal frames under different loadings//
What is meaning of tlc
how to calculate quantity of bricks in circular manhole with examples.
How much cement and sand are required for 1 square feet of plaster at a thickness of 15 mm at a ratio of 1:4?
how much quantity of 1.5" nails and 2.5" nails are required for conventional formwork shuttering?