Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...


how to calculate the cutting length of steel? by which
formula?

Answers were Sorted based on User's Feedback



how to calculate the cutting length of steel? by which formula?..

Answer / sunil khairnar

(L+2B)-2C Where, L=overall Length, C= cover.
B=Bearing.(where given)
For Hook,Bend,oveplap,additional formulae should be use.

Is This Answer Correct ?    26 Yes 12 No

how to calculate the cutting length of steel? by which formula?..

Answer / ahmed kazmi

detail length _2d = cut length

Is This Answer Correct ?    8 Yes 0 No

how to calculate the cutting length of steel? by which formula?..

Answer / golam mustafa biswas

Total length-t.cover-2d(per bending)=cutting length

Is This Answer Correct ?    0 Yes 1 No

Post New Answer

More Civil Engineering Interview Questions

Curvature ki quantity kaise nikalte hai pls give me ans... curvature canal ka hai

0 Answers   HR Construction, JP Group,


Which architectural movement is also known as jazz moderna?

0 Answers  


Draw a neat sketch showing the 'throat' of a welding in a plate girder ?

0 Answers   Rites,


Where will be the maximum bending moment in a TEE Beam?

2 Answers   Tulip,


If a slab concrete is placed with M-20 grade concrete, actually it has to be placed with M-30. what are the rectifications / measures to be taken after concreting is done.

0 Answers   BARC,


why seismic analysis not done during design of slabs

3 Answers  


Cube tests of concrete are failed at 7 days and 28 days.What is your next action?

8 Answers   AppLabs, Parsvnath,


In csae of hume pipes NP stands for Non Pressure bur what does it really mean?

0 Answers  


Test procedure of fly ash bricks as per code ?

0 Answers   L&T,


1 bundle=how many rods s there? and what is the length of each rod

2 Answers   Sobha Developers,


what is hydrostatic paradox?

0 Answers  


What is the tallest man made structure in the world?

0 Answers  


Categories
  • Civil Engineering Interview Questions Civil Engineering (5086)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4456)
  • Electrical Engineering Interview Questions Electrical Engineering (16639)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)