how to calculate the cutting length of steel? by which
formula?

Answer Posted / golam mustafa biswas

Total length-t.cover-2d(per bending)=cutting length

Is This Answer Correct ?    0 Yes 1 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

what is yield and tensile strength of steel, if steel has yeilding strength of 60 psi than how much its tensile strength?

1575


How to calculate the area in squarefeets ?How much area of sqft for this measurements?East 53.3ft West 54ft North 47.7ft South 51.1ft ?

1433


silt%= silt volume/ silt+sand volume is this right?

1498


Why are steel plates inserted inside bearings in elastomeric bearing?

825


what is the effect of duration of earth quake on framed structures ?

1803






What is the tensile strength of wood?

646


Please let me know about answer for my Question as "What is the maximum wastage allowable of HYSD Steel in any Bridge project as per Code and Code reference also ?

1438


what is labour consume factor in residential projects

1846


What is the strongest bridge for a school contest?

705


What are the skills required to become an architect?

635


1) a)to prepare mortar for bricklaying how much amount of water should be added for its maximum strength and workability(to avoid cracks which results, when high quantity of water is added)?is their a formula or ratio? b) suppose we want to make 1:3 mortar,what is the best way to measure cement ,sand and water and how? c)time before which freshly prepared mortar should be used? d)proper way to mix and make mortar? e)when should curing start after laying bricks and for how long?and also how many hours per day? f)what is shear wall (please in terms of layman lol) bookish definisions are confusing.... g) and last,acc to codes what are max no. of course that should be laid in a day.

1682


What are the steps involved in the concreting process?

863


What is Rankine Cycle?

658


1)What is the total volume of aggregates required for 1cu.mtr.solid hard concrete? 2)What is total mass of wet concrte and dry concrete after 28 days of M25? 3) Is 28 days strength is the final strength of concrete or it gets increasing as the time period increses.? 4)What is the volumetric proportion of concrete grade of M25.M30,M35,M40

2251


What is rate for brick masonry work of 1.0 m3 in cm 1:6?

732