what is the full form of KVAR
Answers were Sorted based on User's Feedback
Answer / ramendra shukla
s we know there are three types of power in Electricals as-
Active, Apparant & rective.
so KVAR is stand for ``Kilo Volt Amps with Reactive
component i.e. Sin phi.
| Is This Answer Correct ? | 66 Yes | 7 No |
Answer / k.prakashchandra
K-Kilo ,V- Volt ,A- Ampere ,R- Reactive
| Is This Answer Correct ? | 53 Yes | 5 No |
Answer / abhishek devarakonda
kilo volt ampere reactive...
KVA is apparent power
KVAR is Reactive power
KW is True Power/Real power/Active power
| Is This Answer Correct ? | 22 Yes | 0 No |
Answer / ginjala srinivas rao
In 3phase System, there are 3 powers, i.e., Apparant or True
Power in KW(Kilo Watts), Active Power in KVA(Kilo
Volt-Ampere) and Reactive Power in KVAR(Kilo Volt-Ampere
Reactive).
| Is This Answer Correct ? | 12 Yes | 3 No |
in dc transmission the frequency pi is zero, then how it will transmit communication signal?
What percentage netural current is in netural depend upon the phase current
What is the difference btwn grounding and earthing?
what are the main components of fan?
Define ampere
WHAT IS MEANING OF Gg & Gg IN hrc FUSE
help me with the question that might be ask on the interview for technical position
in which direction real power and reactive power flow and why???????
What is the use of starter in tube light fitting.how it works.
HOW DO YOU PROVE THE HIGH VOLTAGE CABLES OR BUSBAR IS DEAD EVEN AFTER IT IS DE ENERGISED
What does OHB stand for in specifications for circuit breakers, especially found in SF6 circuit breaker?
Please clarify, 1. Is it required to lay two runs of GI wire along with Armoured LT cable if it is laid between one big mains (63Amps TPN SDF) to small main (32A TPN SDF) with proper glanding termination? 2. If the armoured cable with proper glanding is laid from DB to CNC machine, is it required to run two runs of body earthing to the Machine from DB? 3.If the armoured cable with proper glanding is laid from Substation to Hangar, distance is approx. 100 mtrs, is it required to do earthing at shop area though the primary termination at substation is earthed through gland.
Civil Engineering (5086)
Mechanical Engineering (4453)
Electrical Engineering (16638)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)