Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...


Please clarify,
1. Is it required to lay two runs of GI wire along
with Armoured LT cable if it is laid between one big mains
(63Amps TPN SDF) to small main (32A TPN SDF) with proper
glanding termination?
2. If the armoured cable with proper glanding is laid from
DB to CNC machine, is it required to run two runs of body
earthing to the Machine from DB?
3.If the armoured cable with proper glanding is laid
from Substation to Hangar, distance is approx. 100 mtrs, is
it required to do earthing at shop area though the primary
termination at substation is earthed through gland.


No Answer is Posted For this Question
Be the First to Post Answer

Post New Answer

More Electrical Engineering Interview Questions

What is the Derating factor of power cables when exposed to direct sunlight in (both PVC & XLPE).

1 Answers  


i need about 10 years of GATE solved papers in pdf format and even mock tests toooo

0 Answers  


why mostly conductor made by 7 nos wire?

1 Answers  


How to calculate the breaker's short circuit current?

1 Answers  


what could be the reason of a burnt current transformer in an electrical panel

1 Answers   ERWAT,


If the ceiling fan is on slow speed, does it consume less electricity?

2 Answers  


How to calculate the Airconditioner capacity for a standard telecom BTS shelter?

3 Answers  


Relay setting for earth fault of reciprocating and centrifugal compressor motor feeder.Setting will be different or same?

1 Answers   Reliance,


What should the transformer connection of a 11/220 kV step up and 66/11 kV step down transformer ?

4 Answers   CGL,


How to calculate or testing the KW in generator

1 Answers  


what happens if we give 1-ph supply for 3-ph Bridge rectifier...??

2 Answers   Sanelec,


an off load but energized 11/0.4 KV, 1250 KVA T/F has a power factor of 0.65(capacitive)..!! why is it so, though T/F being an inductive device ??

4 Answers  


Categories
  • Civil Engineering Interview Questions Civil Engineering (5086)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4456)
  • Electrical Engineering Interview Questions Electrical Engineering (16639)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)