please know me that required quantity of cement , sand , water and bricks for 1 cub meter of brick work
An invisible line should intersect a visible line with
1 Answers PSC, PSCI, SPC Systems,
What distance in meters on the ground is the equivalent of one second of arc in longitude or latitude?
what is relation between SPT N value and driving piles after conducting a soil test?
Sir your company in receiver ment of civil engineering.
Can we apply curing compound on ceiling (slab Bottom)
while measuring slab for concrete Quantity it is practiced that steel quantity is not deducted in that particular qty.why?
what is the name of coarse sand which is used in making of concrete
I am in India. Employer A got approval for my H1. But they have no job for me now. Company B is going to file H1 for me. They do not know about company A. Is there any way that I get approved H1 of company A transferred to Company B?
How to calculate the wall thickness of building?
#include<stdio.h> main() { int a=300,b,c; if(a>=400) b=300; c=200; printf("\n%d%d",b,c);
Soil will be infertile , When PH value of water will be A] 11 B] 10 C] 9.5
What is portland cement
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)