Please tell me how many bricks needed for 4.5" bricks per
m3(how to calculate this also), and outurn of mason. Thanks.
Answer Posted / haris iqbal
frist calculate total volume of your brick work
VOLUME OF TOTAL BRICK WORK= L*B*H
NO OF BRICKS = total volume of your brick work * 13.5(one
cubic feet of work requried 13.5 bricks including mortor)
| Is This Answer Correct ? | 1 Yes | 0 No |
Post New Answer View All Answers
How to calculate Acctually Brickwork Quantity in Honey Comb Brick in circular Soak Pit
Suppose you planning to paint newly fabricated workshop building made of structural steel of 10 tons total mass. How many litters paint primer for 1 coat and 2 coat of top coat?
What is the different type of slump test indications?
we have a bore well 275 depth & water is deliver at distance of 1000 feet from the borewell here iam not include the distance of depth and the deliver water horizontally at our reserviour tank on ground level
what is the max. and mim. height of vertical post in informatry sign board which is used in highway projects.
What is the worlds largest concrete dam?
IS code for grade of concrete for bamboo lintel????
why we provide bent up reinforcement bars at l/4 ? if it is because of diagonal shear , how does it acts ?
what will happen if one could not properly follow the spacing of slab reinforcement bar?
What is demising walls?
Explain creep?
what is kribs is supporting?
What is Critical path in Ms-Project ?
sir please send me campus placement questions in civil engineering
1.How much batten required for 1 sqm Shuttering. 2.how much pipe & clamps required for staging of 100 sqm shuttering at 5.0 m height.