Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...


What should be the min.compressive strength of cc cube
after 7 days testing and 28 days testing for M25 design mix
conc.?pl give idea with relavant is code

Answers were Sorted based on User's Feedback



What should be the min.compressive strength of cc cube after 7 days testing and 28 days testing fo..

Answer / pk singh

67percent for 7 days
100 percent 0r more for 28 days
is 456 -2000 code is refered

Is This Answer Correct ?    41 Yes 10 No

What should be the min.compressive strength of cc cube after 7 days testing and 28 days testing fo..

Answer / muthu kumar

70% of the 25N/mm2.......

Is This Answer Correct ?    30 Yes 9 No

What should be the min.compressive strength of cc cube after 7 days testing and 28 days testing fo..

Answer / mohammed aaqhil inayath

It depends on the grade of concrete you use. If it is M25
then 65% of the total strength(i.e. 65% of 25 n/mm2)

Is This Answer Correct ?    38 Yes 20 No

What should be the min.compressive strength of cc cube after 7 days testing and 28 days testing fo..

Answer / saumik mallick

After 7 Days the test result will be 67% of the Target Mean
Strength and after 28 days the test result will be 100% or
more than target mean strength.
i.e Target mean Strength (fck')= fck+(1.65*S)=
25+(1.65*5)=33.25 Mpa.

Is This Answer Correct ?    16 Yes 4 No

What should be the min.compressive strength of cc cube after 7 days testing and 28 days testing fo..

Answer / m g patel

First it is depends upon curing peried,when proper curing
then i show 85 percent strength in 7 days and 120 percent
strength in 28 days in m-25 concrete.

Is This Answer Correct ?    11 Yes 5 No

What should be the min.compressive strength of cc cube after 7 days testing and 28 days testing fo..

Answer / kkn

ANY CODE FOR 7DAYS CUBE RESULT,BUT IS 456 ONLY AFETR 28
DAYS ONLY WE CONCLUDE THE STRENTGH

Is This Answer Correct ?    7 Yes 1 No

What should be the min.compressive strength of cc cube after 7 days testing and 28 days testing fo..

Answer / vijay khankra

65 percent Strength for 7 days and
99 percent 0r more for 28 days.....

Is This Answer Correct ?    5 Yes 0 No

What should be the min.compressive strength of cc cube after 7 days testing and 28 days testing fo..

Answer / dantroliya mujtaba

M 15=10 N/mm²
M20=13.5N/mm²
M25=17N/mm²
M30=20N/mm²

Is This Answer Correct ?    3 Yes 1 No

What should be the min.compressive strength of cc cube after 7 days testing and 28 days testing fo..

Answer / viren lagwal

after 7 days strength of cc cube is 17n/sq.mm and after 28 25 n/sq.mm

Is This Answer Correct ?    1 Yes 0 No

Post New Answer

More Civil Engineering Interview Questions

As per Kandal suggestions, we have implemented rolling starts on 140 (+/- 5) degrees and we kept 3 rollars to complete the rolling before falling 125 degrees and the Aggregate AIV is below 22. But When the DBM bed is being rolled 3rd high viabration, (Before 1 plain & low ,2 high Viabrations), the aggregate is getting sharp edge agg. projections are damaged. As the literature is said that, the VG-30 Grade having better control the temp. susceptibility than Penetration grade. if so we could not get this problem at site. But we are facing on site. let me know.

0 Answers  


please send me bhel questions on rupesh.017@rediffmail.com

0 Answers   Bhel,


Why sea sand and desert sand are dont used for construction

1 Answers  


How much bricks in 1sq.meter with thickness 9inch.

3 Answers  


37.18kg/qu.cm.Compressive Strength and 10.20% Water Absorption weight,Efflorescence-nil  this result use in construction work

1 Answers  


How musch steel i.e. angles, channels,and square pipes are required per square feet for a steel roof of residential two storied building?

0 Answers  


How do you measure water flowing through 300mm diameter pipes?

0 Answers  


Though Column is a compression member and concrete takes compression, why we use steel at column ?

4 Answers  


procedure to calulate the how much bag of cement is used for M20 grade?

5 Answers   L&T, NCC, Sahyog,


If we buy crush sand for 3200/ Brass and cement for Rs350 /Bag and flyash 1200 / tonne....and my production is 230 Bricks per bag than how much cost is required for 1 flyash brick?

0 Answers   ABC,


How to find out slope footing concrete

0 Answers   Ekta World, Punj Lloyd Ltd,


What is structural frames or systems?

0 Answers  


Categories
  • Civil Engineering Interview Questions Civil Engineering (5086)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4456)
  • Electrical Engineering Interview Questions Electrical Engineering (16639)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)