What should be the min.compressive strength of cc cube
after 7 days testing and 28 days testing for M25 design mix
conc.?pl give idea with relavant is code
Answer Posted / kkn
ANY CODE FOR 7DAYS CUBE RESULT,BUT IS 456 ONLY AFETR 28
DAYS ONLY WE CONCLUDE THE STRENTGH
| Is This Answer Correct ? | 7 Yes | 1 No |
Post New Answer View All Answers
what is the method used for marking of cantilevers in hirise buildings by using theodolite
how to estimate material requirement for an area of house in square feet?
What is Grid floor and mention its advantages ?
What does civil engineering mean?
how to calculate number of bitumen for road asphalt
cause of cylinder test failure
How to calculate steel for beam slab and column
Dear Frds, How can i calculate the Steel for RCC Slab, Please provide one Example also, so that i can understand very well. Ex: Area: 1320.0 Sft.(44' X 30') Span: 15'(Default). Column Size: 9"X15"(6 No.s 12mm Rods) Please Provide Calculation Details. Thankyou. Satish
Explain what is the release of lien?
How to fix the reinforcement in footing shorter bar at bottom and longer fix at top.
What are the steps involved in the concreting process?
What is the difference between EPC,DBOOT and BOOT.
Draw the cross section of a boundary wall and label its part with detailing?
how many BSCs can i connect to the HUAWEI MSC
insted of bentonite we can use any alternate material in piling ?