What should be the min.compressive strength of cc cube
after 7 days testing and 28 days testing for M25 design mix
conc.?pl give idea with relavant is code

Answer Posted / dantroliya mujtaba

M 15=10 N/mm²
M20=13.5N/mm²
M25=17N/mm²
M30=20N/mm²

Is This Answer Correct ?    3 Yes 1 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

Time required for curing of wall tiles before fixing

1761


What is the material consumption- cement,sand,tiles etc for Toilet dado?

7045


How much time Required for PPR pipe network testing

1685


what happening if we casting HV shunt reactor foundation pad at 50cm height different time (One day difference)

1275


What is the difference in painting using Roller and Brush? What is the paint consumption difference? As per IS one coat of painting is painting from left to right and top to bottom whether this can be done using roller ( Roller Stick height and feasibility) ?

1002






What is the general specifications of a bituminous pavement road?

1229


How to calculate 1 brss for RCC work  

1608


Determine the production capacity of a treatment plant for a city of 1,250,000 population. Assume the specific consumption per capita of 15ol/c/d, non-domestic water use of 30,000,000 m³/year, and UFW of 12%.

662


hi, i am appearing in HPCL(CIVIL ENGG.)exam. plz send me placement paper of this exam if u are having

2033


1. HOW MUCH CEMENT AND SAND REQUIRED TO PLASTER 100 SQM WALL. 2. HOW MUCH CEMENT AND SAND REQUIRED FOR SCREED WORK OF AREA 30 SQM

2646


50 acre of land to be reclaimed for an average height of 2.5 mt. Dredging area is 500mx200m size. what is the dredging depth required to reclaim the area?

1301


how much percent are used 20mm,10mm?

1435


What is change order request?

670


How foundation is designed, Column design and beam design

1855


An interior designer designed a rack with the given dimensions. The dimensions are in feet. This coplanar frame repeats at every 5feet and constitute a space frame. The total length is 120feet. Which steel member will you suggest? A square bar, A square tube or a circular tube. Explain.

1546