What should be the min.compressive strength of cc cube
after 7 days testing and 28 days testing for M25 design mix
conc.?pl give idea with relavant is code
Answer Posted / vijay khankra
65 percent Strength for 7 days and
99 percent 0r more for 28 days.....
| Is This Answer Correct ? | 5 Yes | 0 No |
Post New Answer View All Answers
how to calculate the strength of rebound hammer test reading in building construction ?
how much percent are used 20mm,10mm?
What are the advantages of cad?
How to calculate cement, water, fly ash amount for 1 cum if the w/c ratio is 0.4 and fly ash to cement ratio is 1:9
Write short note on construction programme for pile foundation.
How to calculate material and labor required for 100 m2 plaster?
03. a. The water cement ratio for achieving maximum strength of concrete is…… 1 b. Water/ cement is inversely proportional to-------------- 1 c. Increasing the slump decreases the strength: True / false 1
how to calculate total cost for slab 35'×8'
How and where are aqueducts built?
In few lines, please be elaborative on extras and talents that make you a potential candidate for the post:
Can a wave happen in the middle of the ocean like in the movie poseidon 2006?
What are the phases inspections are done by local authority while construction?
Explain the different types of building contracts?
What are the important hardware systems used for cad?
what is w/c ratio in dry lean concrete for m10 mix design