Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

What should be the min.compressive strength of cc cube
after 7 days testing and 28 days testing for M25 design mix
conc.?pl give idea with relavant is code

Answer Posted / saumik mallick

After 7 Days the test result will be 67% of the Target Mean
Strength and after 28 days the test result will be 100% or
more than target mean strength.
i.e Target mean Strength (fck')= fck+(1.65*S)=
25+(1.65*5)=33.25 Mpa.

Is This Answer Correct ?    16 Yes 4 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

Can we apply curing compound on ceiling (slab Bottom)

736


Define What glue is least sticky?

1020


With reference to construction of state highways, please let me know the total Bill Of Quantities as per the following details:- 1) Subgrade - 500 mm 2) Granular Sub-Base (GSB) - 200 mm 3) Wet Mix Macadam I (WMM I) - 150 mm 4) Wet Mix Macadam II (WMM II) - 100 mm 5) Dense Bituminous Macadam (DBM) - 60 mm 6) Bituminous Crust (BC) - 40 mm Road Length is 44 Kms. Road Width is 7 mtrs. Please provide the BOQ of each layer as per Compacted Factor & Loose Factor both. Also, if possible please provide me the approximate details of total material required (all categories viz. soil, gravel, stone aggregrate, sand, bitumen etc.) as per general mix design prevailing in India. Thanks & Regards -- Rokr

2394


how many men days of loburs and masons are requirete for 1 cum,pcc (1:2:4),Pcc(1:3:6) and Pcc(1:4:8) thanking you

2549


How Can I know the wastages(%) of each work added in estimating the quantity of construction materials?(Eg. Ceiling Work, Brick Work,etc....)

1998


The 4 main factors to start a construction project are––

2223


a) Difference between Ghol , Chimney & fly ash bricks b)Floor to floor height is 3m , rise=15cm , tread 20 cm , how to design staircase means steps landing

3205


What is chemical composion test

2004


What out turn civil works

6750


How can i do RCC rate analysis?

1636


Can you pl explain the procedure steps of singly and doubly reinforced beams in limit state method

1704


roll of DLC in road constructions

1832


what is kribs is supporting?

1967


how to absorb to site basic corrections? which are the important correction?

1428


how much is the maximum compressive strength of soil cement and soil-cement-microsilica .

2226