adspace
sir i want to know that in L & T construction can we do our
6 months training proggramme cum placement???????
Answer Posted / Shashi Jyoti Gupta
It is not uncommon for large construction companies like L&T to offer training programs along with placements. However, specific policies may vary depending on the division and the location. I recommend visiting their official website or contacting their HR department directly for accurate information.
| Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
Which is the latest version of solidsworks?
How much area, in square meters, will one liter of paint cover if it is brushed out to uniform thickness of 100 microns?
can any one give me sample question paper of BHEL at mdansari86@gmail.com as i m appearing for the same exam.
I HAVE APPLIED FOR 20TH UES ARMY. I WANTED TO KNOW WHEN WILL I RECEIVE CALL LETTER FOR THE SAME.
400 ku d/c clearess ketan hota hai?
material used for mendrel use to bend epoxy coated rebar
what is the difference between replacement of cement by groundnut shell ash
hii.plz send me hpcl placement papers for officers trainees for graduate engg plz my email id is ajm_knit@yahoo.com
can u plz send me ntpc placement papers(civil engineering) at mohit_verma21@yahoo.com
HOw much % of premium on DSR-2013 currently
how to decide the mortar ratio 1:4,1:6 in masonry? same in plaster 1:3 and 1:4? which code or any document reference taken to define proportion?
manhole chamber having height of 2300 mm and thickness of brickwork is 230 mm and dia of opening covering is 560 mm and bottom length vertical is 1500 mm (1:4) brick masonry and plaster 12 mm on both sides..how to estimate the no bricks used with mortar cement bags and sand for total chamber including plaster.
water leak detection system question & answer
Re: Can anybody help me by attaching files , formats for quality checks of common building materials like cement , concrete , bricks , sand and aggregates? please my email id is smgujjal@gmail.com
5. Two long boundary walls run parallel to each other at a center to center distance of 1 meter apart. The width and height of the first wall are 0.30 m and 2.5m respectively. While those of the second are respectively 0.18m and 3.5m. Plot the distribution of vertical stress intensity due to walls on a horizontal plane, 1m below ground level. The walls have negligible depth of foundation and are made of brick masonry (y = 19.2 kN/m cu)