How manu days after the casting of a slab another slab can
be casted above it?
what is the total curing time of a slab if ponding is not
done on it?
Answer Posted / fayaz
27 days
| Is This Answer Correct ? | 4 Yes | 3 No |
Post New Answer View All Answers
for Precast foundation howmany days required we can shift the foundation with american Standards i need reference with section any body can help
What is the difference between shear and tensile strength?
reinforcement slab, beam and column formulas?
If we have the center line of the Finnish road level and we want to know what level of pay would have offset the Lhs and Rhus RHS 1,2.5,5 1,2.5,5 m.
Draw the cross section of a boundary wall and label its part with detailing?
What is fineness modulus ? and its sieve # ?
CAST EFFECTIVE WATER SUMP CONSTRUCTION DETAIL
Explain the importance of moment of inertia?
how much brick, cement, and sand required in 1mtr X 0.23mtr X 1mtr brickwork(1:4), 230mm thick wall and 10mm thick mortar , brick size 230mm X 70mm X 110mm
What is the use of mirror command?
Required concret Surface Temperature prior to coating of epoxy pain with references ASTM or ACI whatever
Providing and casting in situ cement concrete M-25 of trap/granite/quartzite/gneiss metal for rcc, Providing formwork,Curing the concrete and Complete. what is rate per Cum. and what is rate for M-30 Grade Concrete.
what is the minimum cement content for M20 & M25 as per is code -456(2000).
why we are useing plastic under the lean concrete?and whts the advantage?
i just want to know how much require sand and cement for 1 sq.mt including wastage. Please guide me as soon as possible.