How manu days after the casting of a slab another slab can
be casted above it?
what is the total curing time of a slab if ponding is not
done on it?
Answer Posted / irfan
20
| Is This Answer Correct ? | 5 Yes | 4 No |
Post New Answer View All Answers
In the roof of a pumping station explain briefly the components of a waterproofing system?
What is standard Sand? What is Regime condition? What do you mean by the core trench in Earthen Dasm? What is soundness test for cement? When negetive shear force takes place in a R.C.C member?
On what basis we decide the formation level of the road? other then that of 50% Cutting and 50% Filling??
What is the difference between tor steel and tmt steel?
Is there the dry coefficient of cement is constant?
Required amount of Steel bars, cement/ square feet for roofing of residential building upto 3rd floor.
manhole height is 1500 mm and width of brickwork is 230 mm dia of manhole covering is 560 mm brick masonry 1:4 horizontal length is 1500 mm and plaster 12 mm thick on both side 1:3. how to estimate the quantity of brickwork with mortar cement and sand for manhole chamber.
how much cement sand n bricks required in im3?and how much in plaster?
Pls help me to arrive the rates for centering shuttering for highbay using H-frames?
what should be the PCC ratio to construct a plinth of (40x40x4)ft...??also its estimated cost??
How much quantity of cement Bag for block masonry (1:4) for 1 cu.m? Block size (150x200x400) Mortar Thickness 20mm
Dear Engineers, Can you please advise me the material requirement to construct a room 4 M x 4 M 1. No. of Standard Brick 2. Requirement of Cement Bags 3. And Concrete for Steel, Cement, sand, etc Thanks
how to design and calculate materail quantity for concrete speedbreaker ?
how the calculation occurs if i want to mix 1cum of M50 concrete. please calculate every ingredients with detail calculation.
660 square fit two story house make totally how much cement, sant, brick,aggregate, steel totally how much need