How manu days after the casting of a slab another slab can
be casted above it?
what is the total curing time of a slab if ponding is not
done on it?
Answer Posted / thiraviam
after casting the salb it will take 28 days to cure
in 7 days time it will cure 65% and the rest will take
remaing days to cure
| Is This Answer Correct ? | 5 Yes | 1 No |
Post New Answer View All Answers
What is the density of DLC & PQC and how it is differ from normal concrete?
Does VDF add strength to the flooring apart from preventing water ingress?
how to find quantity of concrete in PCC M15
What is the standard volume of pharma in cub ft
57. Calculate the volume of a truck loaded with stone chips whose data are as follows– 5 Top Length - 13-9, 13-10, 13-09 Bottom Length - 13-11, 13-10.5, 13-10 Top width - 8-7.5, 8-8, 8-7 Bottom width - 8-7, 8-8, 8-7.5 Depth - 2-0, 1-11.5, 1-10, 1-11, 1 -10.5, 1-11.75, 1-11
How does siphoning work?
how much area can be platered by a mason for exterior
what is the hanekom repairing material after concreting work
I want to change job.If You have any vacancy please contact me in this mail id-parthamitra086@gmail.com.Myself partha mitra.Diploma in civil engineer with 4+ yrs. exp.Now in kolkata.If you confirm me then I will send my detail resume to you.Also send your mail id to me.My mail id is-parthamitra086@gmail.com.I will be very much thankful to you.
how much is the maximum compressive strength of soil cement and soil-cement-microsilica .
Design a shear wall of length 4.20 m and thickness of 250mm subjected to the following forces.Assume Fck = 25Mpa and Fy = 415Mpa and the wall is a high wall with central part 3440mm x 250mm and two 380mm x 760mm strong bands at each end with following loading. S.No. Loading Axial force Moment Shear 1 DL+LL 1950 600 20 2 Seismic load 250 4800 700
How to calculate the crank rod in slab
Formula for calculation volume of essentric footing
How to calculate the quantity of ingredients of M20 grade concrete?
Please let me know about answer for my Question as "What is the maximum wastage allowable of HYSD Steel in any Bridge project as per Code and Code reference also ?