How manu days after the casting of a slab another slab can
be casted above it?
what is the total curing time of a slab if ponding is not
done on it?
Answer Posted / thiraviam
after casting the salb it will take 28 days to cure
in 7 days time it will cure 65% and the rest will take
remaing days to cure
| Is This Answer Correct ? | 5 Yes | 1 No |
Post New Answer View All Answers
How to test cement,sand,20mmbluemetal,40mmbluemetal,bricks,concrete by visual and instrument
Is it worthwhile to carry out tests on particle density of soil particles for geotechnical design?
Please design 12.5m long dubbly beam
What is semirigid connections?
What is high adherence steel bar? I have a general specification which refers to High Adherence steel bars, coils and meshes to BS EN 10080 and BS 4449 or BS 4483. Is this just general re-bar or is there something different about it? The spec originated in France.
At one time what is the height of Lift for concreting for Bridge Piers Class B Loading and refer the code.
i am completed my b.tech EEE in 2009,,,iam trying the job 3+ for AUTO CAD (ELECTRICAL),, what is the market for autocad electrical in hyderabad... how to handle the intervws give some suggestions ?
What is an object snap mode?
Define What is passive earth pressure ?
Power grids in two adjacent states(A&B) are interconnected. Can power grid in state A can be represented by Thevenin Equivalent Circuit. If not explain Why?
What do you understand by “preset” during the installation process of bridge bearings?
What is the meaning of Brick- M 35 grade? Is it a common brick or it's a concrete brick?
Are cruise ships built for the transatlantic run?
what is the water cement ratio for plastering
Define What happens to Load at yielding ?