How manu days after the casting of a slab another slab can
be casted above it?
what is the total curing time of a slab if ponding is not
done on it?

Answer Posted / satishkumar

after 21 days.if ponding is not then 28 days curing reqd it may depends upon season.

Is This Answer Correct ?    1 Yes 1 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

how to read the drawings to find the quantity of steel in a storm water manhole or any other structure?

2139


according to the painting co efficient, we should take the one side of doors (or) windows or both sides?

1310


Why are pull-out tests performed for soil nails?

749


i have a interlock pavement work.i need to compact about 2000 sq metres of sub base grade c of thickness 15 cm.what is the amount of water required for compaction ??

1637


residential buildings,mixing of concrete,structural,construction material,site handling.

2018






how to calculate the material from ratio of work PCC, RRM,POINTING, RCC

1884


how much is the maximum compressive strength of soil cement and soil-cement-microsilica .

1822


if size is 235cmsx15cmx100cms so how many cement bags and how many sand bags are used for concrete mix

1499


can stub column take the load as main column

1415


plumbing CPVC fitting FTE Brass full form

2131


what is labour consume factor in residential projects

1849


Can anyone tell me the sequence of the activities in a drawing room, kitchen & Toilet including civil work, finishing, electrical & plumbing fittings

1645


Bearing capacity of soil determined as per ASTM is to design the foundation size.what is the importance of EV1/EV2 value as per DIN .My consultant ask me to test the the soil as per din to find out this ratio to assess the compacted strength of soil ,,?? is it meaning full ??

1909


Rate analysis of Vitrified tile in cement mortor 1:3

3935


in a building why we are using T beams? why can i adopt beam bottom & Top level as same as slab bottom & Top level?

1842