list of tests to be carried out at manufacturers end while purchasing a step up transformer of 11kv to 66kv ,2MVa Capacity.
No Answer is Posted For this Question
Be the First to Post Answer
sir vizag steel ka junior trainee ka paper kitne number ka ayega
Basic philosophy of applying 3P tripping for uptill 132KV switchyards & for 132KV & above 1P/3P tripping is used.
why d.c. supply is given to the primary side of generator?
What is knee point voltage?
can anybody tell me that for p.f. Improvment we use capacitor banks but how to decide its capacitance. As we all know how to calculate kvar but what abt capacitance value
what are the major difference between 3phase 3wire and 3phase 4wire trivector meter?
for a machine R=130 KVA Y=132 KVA B=144 KVA Then what will be the total kva
how to check 3phase motor winding with help of multimeter?
i have ht transformer of 142 kva with air cooled facility,having secondary voltage 7850volt, and secondary connected full way bridge rectifier .i faced the problem repeatedly that transformer one coil and rectifier diode of two phase was burnt two times. i checked all the secondary ckt. no any short ckt found,then what will be the cause side
2 Answers Modern Terry Towels,
which type of oil is used as a transformer oil?
how c-curve of mcb's actually looks alike?
What is inrush current?
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)